The problem What goes wrong today, and for whom.
Families in malaria areas get bitten in the evening while they are awake, indoors and on the veranda. Bed nets only protect people asleep under them. Coils smoke and burn out every night. The only two repellent devices approved by WHO, the World Health Organization, both come from SC Johnson, a US household-products company. One works indoors only and the other lasts about a month. No one sells an open design that regional factories can build, so poor households wait on one supplier.
The hypothesis Why this invention needs to exist.
A chemical surface left open to the air gives off much more in hot months than in cool ones. A plain sheet would therefore empty early in the heat, or carry far too much chemical. Medicine skin patches solve the same problem with a thin film that sets the pace. If the repellent must creep through solid plastic to leave, heat speeds it far less. Then one cheap sealed sheet can last a year in a fixed frame. A dye that leaves through the same film can show when to swap. Because the frame stays up for years, the yearly cost is mostly the sheet. Regional net and plastics makers already run the needed machines, so an open design gives buyers a second source.
What it instructs How it is built, the way a patent teaches it.
Mould one grey plastic frame with side rails, a slotted grille in front, a hood over a top slot and a small round window in the lower corner. Fix it with screws, nails and washers on a wall, or strap it to a veranda pole. Break off one of two small ribs inside to set the frame for indoor or veranda use. Make each yearly sheet by loading transfluthrin into a soft store film, laminating a rate-control film over it and heat-sealing the edges. Add a dye square behind the same film beside a grey reference bar. Cover the face with a peel-off liner whose stiff foot holds the sheet off its seat. Seal the sheet in a foil pouch. The household slides the sheet in and pulls the liner out through the top. The sheet drops and clicks only when the liner is fully gone.
Target KPIs The numbers that show it works, today against the target.
| KPI | Today | Target |
|---|---|---|
| Landing cut at year end, lower of room and veranda | Guardian, SC Johnson's year-long indoor repellent device, covers the room only; nothing passive covers the veranda | at least 70% fewer landings |
| Hot-to-cool release ratio of the framed sheet | A bare chemical surface speeds up roughly three times between a cool and a hot month | 1.5 times (release at 35 °C ÷ release at 25 °C) |
| Household kit price per year, ex-factory | Coils cost a few cents every night; the two approved devices have no public price | under 1.00 $ per household per year |
| Delay between losing protection and the mark changing | The monthly sheet is swapped by calendar, with no mark tied to protection | 30 days |
| Frames still fixed and aimed at year end | In Kenyan homes, tape failed on rough walls and hooks fell off | at least 95 of 100 frames |
How to read this
| Must | A critical requirement. The product fails without it. |
| Should | Every other requirement. |
| System and subsystem | Where a system requirement and a subsystem requirement differ, the system requirement governs. |
| Confidence | High, Medium or Low: how sure the agents are the design meets it. Needs a test: only a working prototype can prove it. |
| Sizes | SI units: millimetres, grams, seconds; prices in US dollars. Design intent, to be confirmed by the prototype shop. |
| Basis | Where a size came from: a requirement, a standard, a calculation, or engineering judgement. Judgement sizes are provisional. |
| Numbers in brackets | The part numerals on the patent drawings. |
| Engineers | Start with Requirements and the Verification plan. |
| Manufacturers | Start with the Specification, the Parts list, How it works, step by step (the drawings), and Making and assembling it. |
What it is
Two identical grey wall frames, one indoors and one on a roofed veranda pole, each hold a factory-sealed yearly sheet that lets out transfluthrin, a mosquito-repelling chemical, through a slow film with no power, heat or smoke, and a dye dot in a corner window turns grey when it is time to swap.
The problem: A repellent left open to the air gives off far more in hot months, so a yearly passive sheet empties early or carries too much chemical. Households cannot tell when protection ends, refills can be fitted with their cover still on, and wall units fall off rough walls.
Design starting point
The proven form this design builds on, set before the specification was written. Most of a good product is established technology done well; the invention is the new part.
| Kind of product | A passive wall-hung vapour dispenser with a yearly refill sheet |
| Established form | A refill holder plus a sealed refill, the form used for passive air-freshener refills and medicine skin patches. A drug or scent store sits behind a thin pore film that sets how fast it leaves, with a peel-off liner on the face and a foil pouch around it until use. The holder is a simple moulded frame the refill drops into. Why firms use it: A store behind a pore film gives out a steady amount each day for months, needs no power, and can be made by ordinary film-coating, laminating and sealing lines. |
| The new part | The yearly sheet is the new part. It is a transfluthrin store under a chosen pore film, sized so its release stays above the effective air level for 12 months from 25 to 35 °C (°C is degrees Celsius). Beside it sits a dye square, behind the same pore film, timed to fade before the sheet stops working. |
| Viability | Viable with changes. Most likely to fail: The release rate drifts over the year. Heat makes it rise, so at 35 °C the sheet could empty early. As the store empties the rate sags, so a sheet could stay in the frame for months while giving too little. On the veranda, wind thins the vapour faster than indoors. How it is avoided: Use the patch makers' answer: the pore film, not the store, sets the pace. Overfill the store so it stays saturated (full to the limit it can hold) almost to the end. Then release stays flat until close to the last weeks. Size the load for the hot 35 °C case plus about one spare month. That spare month is a judgment, to be fixed by test. Give the veranda grade more pore area, and fix both grades b. |
What it keeps of that form
- A plain moulded frame that stays on the wall for years, with a cheap refill swapped yearly
- A refill sheet built like a skin patch: a back film that stores the chemical, a front film with tiny pores that slows its release, heat-sealed edges
- A peel-off liner on the treated face, pulled away by a tab after the sheet is in place
- A foil pouch around each sheet so no chemical leaves on the shelf
- Drop-in side rails, the way a water-filter cartridge drops into its jug
- Wall screws, plugs, nails and a strap bought as stock items
Stock parts
- Microporous film: The front pore film that slows release. These are thin plastic films full of tiny holes, already sold by the roll for skin patches and as battery separators (the layer between the two sides inside a battery). Bought by the roll and chosen by pore size.
- EVA store film: The back film that soaks up and holds the transfluthrin. EVA (ethylene vinyl acetate) is a soft, rubbery plastic film already used as the store layer in patches. Bought as blank film and loaded by the sheet maker.
- Transfluthrin, technical grade: The repellent itself. The firm buys it from licensed chemical makers at the purity the WHO prequalification file asks for.
- Siliconised PET release liner: The peel-off cover on the treated face. PET is the clear plastic of drink bottles. A silicone coating lets it peel off cleanly. Stock patch and label material.
- Foil laminate pouch stock: The sealed outer pouch, made of aluminium foil bonded to plastic. It keeps the chemical in during 2 years or more of storage and shipping. Stock sachet film run on a standard pouch sealer.
- Dye: Colours the end-of-life square. A stock dye that dissolves in the same store film.
- Screws, wall plugs, masonry nails, washers: Fix the frame to block or mud walls. Hardware-store stock, packed two of each per frame.
- UV-stabilised nylon cable tie: Straps the frame to a veranda roof pole. UV-stabilised means it is made to last in sunlight. A heavy stock tie about 8 mm wide.
Changes from the first concept
- Ship each sheet in its own sealed foil pouch. Put a siliconised liner on the treated face. The household slides the sheet in by its tabs, then pulls the liner out through the top slot. This replaces the foil-and-tear-strip worked inside the frame.
- Transfluthrin melts at about 32 °C, inside the 25 to 35 °C range. Hold it dissolved in the EVA store film so it cannot pool, run or leak when it melts. Seal the edges to match.
- Make two sheet grades of the same size: indoor, and veranda with more open pore area for the breeze. Colour-code the tabs. Both frames stay identical.
- Tune the dye square to fade about one month before release drops below the effective level, at every temperature from 25 to 35 °C. Print the grey comparison bar on each new sheet in fade-proof ink.
- Mould the frame as two snap-together parts: a back plate with the rails and fixing holes, and a front with the grille and hood. The sheet drops in from the top under the hood.
- Set one value of record for each key number: the effective air level, the release rate per sheet grade, and the load per sheet. Every test and every maker works to that number.
How each part is got
| Part | Buy, adapt or make | How |
|---|---|---|
| Frame back plate (rails, fixing holes, strap slot) | Make | Injection-moulded polypropylene, a tough common plastic used for buckets, in a simple two-plate steel or aluminium tool any regional moulder runs. Matt texture on the outside. |
| Frame front (grille, hood, indicator window) | Make | Injection-moulded polypropylene in the same tool family. It snaps onto the back plate with moulded clips, so no screws are needed. |
| Store film | Adapt | Buy blank EVA film. Load it with transfluthrin and dye by soaking or coating on a film or textile coating line. Each line is checked by weighing samples against the value of record. |
| Pore film | Buy | Stock microporous film by the roll, with its pore size picked by test for each grade. |
| Sheet assembly | Make | Laminate the store film and pore film. Add the liner. Heat-seal the edges, then die-cut the tabs and the dye square on a standard patch or label converting line. |
| Pouch | Buy | Stock foil laminate, heat-sealed around each sheet on a standard sachet machine and printed with the date and grade. |
| Fixings and strap | Buy | Stock screws, plugs, nails, washers and UV-stabilised cable ties, bagged with each frame. |
How your attachments were used
hc-a04-digest.txt: 3 ideas used, in the must-dos, the requirements and the package.
13-08-2025-who-recommends-spatial-emanators-for-malaria-vector-control-and-prequalifies-first-two-products: 7 ideas used, in the brainstorm, the concepts, the must-dos, the requirements and the package.
psm_spatial-emanators_list_en.pdf: 2 ideas used, in the must-dos and the package.
malaria-spatial-repellents-may-be-critical-new-tool: 4 ideas used, in the brainstorm, the designs, the concepts, the shortlist, the must-dos, the requirements, the package, the claims and the engineering.
malaria: 4 ideas used, in the must-dos, the requirements and the package.
Completeness check
61 items still to confirm, each marked where it appears. Nothing is left blank.
| Where | What to confirm |
|---|---|
| Requirements | PACE-2 isn't traced to a part yet. |
| Requirements | PACE-3 isn't traced to a part yet. |
| Requirements | FIX-3 isn't traced to a part yet. |
| Requirements | SWAP-4 isn't traced to a part yet. |
| Requirements | MAKE-2 isn't traced to a part yet. |
| Requirements | MAKE-3 isn't traced to a part yet. |
| Diagrams | FIG. 1, Fitted indoors: the pose differs from the layout: the front cover is drawn in place (cut away) in the finished figure, but missing from the layout |
| Diagrams | FIG. 1, Fitted indoors: the pose differs from the layout: a sheet assembly is drawn in place in the finished figure, but missing from the layout |
| Diagrams | FIG. 1, Fitted indoors: the pose differs from the layout: mounting screws and wall plugs are drawn in the finished figure, but missing from the layout |
| Diagrams | FIG. 1, Fitted indoors: the pose differs from the layout: a large backplate assembly is drawn in the finished figure, but missing from the layout |
| Diagrams | FIG. 1, Fitted indoors: the pose differs from the layout: a wall block is drawn in the finished figure, but missing from the layout |
| Diagrams | FIG. 2, Sheet slides in: the pose differs from the layout: the inner mechanism is partially retracted in the layout (its top handle is flush with the top inner ridge), whereas in the finished drawing it is fully inserted (its top handle protrudes above the outer casing's top edge) |
| Diagrams | FIG. 3, Locked and working: the pose differs from the layout: the inner working part shown in figure 1 is drawn over the plain rectangular volume of the layout, but the part drawn is not a correct finished part. |
| Diagrams | FIG. 4, On the veranda: a part is duplicated: the word 'veranda' appears both on the Grade tabs and the Grade selectors, which is unexpected for these parts. |
| Drawings | Dye square under window: its size and tolerance to confirm. |
| Drawings | Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Locking seat the sheet bottom rests on: seat height above frame bottom edge F14 10 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Rail channels, left and right (their centre plane is datum C): channel depth, channel bottom to lip edge 3 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Indoor key rib: indoor rib centre left of the rail channel centre plane (datum C) 49 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Veranda key rib: veranda rib centre right of the rail channel centre plane (datum C) 47 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Fixing holes, two: fixing hole spacing 120 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Frame front with grille, hood and window opening: grille stiffening rib width, two ribs 2 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Frame front with grille, hood and window opening: grille field left edge from front left outer edge 16 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Frame front with grille, hood and window opening: Snap clip hooks, four (their pattern centre is datum B): clip hook engagement 1 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Window lens: lens thickness 1.5 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Masonry nail: shank diameter 3.5 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Masonry nail: length 75 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Masonry nail: head diameter 8 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Masonry nail: head height 1.5 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Releasable pole strap: width 8 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Releasable pole strap: thickness 1.4 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Spreader plate for crumbling mud (only in kits for weak walls): length 250 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Spreader plate for crumbling mud (only in kits for weak walls): height 60 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Spreader plate for crumbling mud (only in kits for weak walls): thickness 2.5 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Spreader plate for crumbling mud (only in kits for weak walls): Outer nail holes, two: outer nail hole spacing 230 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | EVA store film blank: store film thickness 0.45 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Rate-control film: pore film thickness 0.05 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | EVA store film blank: Grade colour tab: grade tab width 30 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Witness dye, reference bar ink and hidden symbol ink: gap between dye square and grey bar 1 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Witness dye, reference bar ink and hidden symbol ink: Hidden crossed-out mosquito symbol: symbol size 6 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting: liner thickness 0.075 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Foil pouch: pouch inside width 186 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Foil pouch: pouch inside length 200 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting: packed length, foot bottom to pull-tab tip, laid flat 181 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Transfluthrin, one sheet's load: loaded zone width 164 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Transfluthrin, one sheet's load: loaded zone height 120 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Frame front with grille, hood and window opening: height where the hood reaches its full 28 mm depth 142 mm is provisional: set by judgement, to confirm with the prototype. |
| Drawings | Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line: pull tab width, centred on the sheet 30 mm is provisional: set by judgement, to confirm with the prototype. |
| Product record | Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector is on the parts list but isn't a part in the record. |
| Product record | Spreader plate for crumbling mud is on the parts list but isn't a part in the record. |
| Product record | Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line is on the parts list but isn't a part in the record. |
| Product record | Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs (P1) is in the record but not on the parts list. |
| Product record | Spreader plate for crumbling mud (only in kits for weak walls) (P9) is in the record but not on the parts list. |
| Product record | Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting (P14) is in the record but not on the parts list. |
| Specification | The specification (PACE-2 Breathing exposure) states 4 m, which no size in the product record gives (4000 mm). |
| Specification | The specification (PACE-3 Landing cut in both spaces) states 4 m, which no size in the product record gives (4000 mm). |
| Specification | The specification (PACE-3 Landing cut in both spaces) states 4 m, which no size in the product record gives (4000 mm). |
| Specification | The specification (PACE-3 Landing cut in both spaces) states 0.5 m, which no size in the product record gives (500 mm). |
| Specification | The specification (PACE-4 Grade key and veranda grade) states 0.5 m, which no size in the product record gives (500 mm). |
| Specification | The specification (SHELL-1 Finger guard) states 80 mm, which no size in the product record gives (80 mm). |
| Product record | The fit-critical feature "Window lens in front opening" states 0.30 mm, which no size in the product record gives (0.3 mm). |
| Product record | The fit-critical feature "Dye square under window" states 9.2 mm, which no size in the product record gives (9.2 mm). |
How it works, step by step
- 10 Frame back plates (2)
- This is the flat rear moulding that sits on the wall or pole. It carries the rails, the seat, the grade selector and the fixing holes, and the front snaps onto it.
- 12 Frame fronts
- This is the grey front face of the shell, with the grille, the brow-like hood and the round window. Repellent drifts out through its slots, while fingers are kept off the sheet 5 mm behind them.
- 14 Window lenses
- This is a clear plastic disc pressed into the round window from inside. Through it the family sees the dye square and the grey bar, so they know when to swap the sheet.
- 16 Refill sheets (2)
- This is the yearly sheet that stores the repellent behind a film with tiny pores, so the repellent leaks out slowly for a year. Its face carries the dye square that fades as it runs out, and its bottom notch matches the grade selector.
- 18 Grade tabs
- This short coloured tab sticks up above the brow, blue for indoor and orange for veranda. It shows the grade at a glance and gives clean fingers something to hold at the swap.
- 26 Rail lips
- These thin lips run in front of the sheet's side edges. They hold the sheet flat in its channels so it slides straight down.
- 28 Locking seats
- This is the ledge near the bottom of the back plate that the sheet's bottom edge sits on. It puts the dye square right behind the window.
- 30 Grade selectors
- This small key slides along the seat and locks for good at the indoor or the veranda end. It fits only into the notch of the matching sheet, so a strong veranda sheet cannot be fitted indoors.
- 32 Wood screws
- These steel screws pass through the hidden holes in the back plate into plugs in the wall. They hold the frame firmly so it cannot fall or be pulled down.
- 34 Wall plugs
- These plastic sleeves sit in holes drilled in the block. They grip the screw threads so the screws hold in the wall.
- 10 Frame back plates (2)
- This is the flat rear moulding that sits on the wall or pole. It carries the rails, the seat, the grade selector and the fixing holes, and the front snaps onto it.
- 12 Frame fronts
- This is the grey front face of the shell, with the grille, the brow-like hood and the round window. Repellent drifts out through its slots, while fingers are kept off the sheet 5 mm behind them.
- 14 Window lenses
- This is a clear plastic disc pressed into the round window from inside. Through it the family sees the dye square and the grey bar, so they know when to swap the sheet.
- 16 Refill sheets (2)
- This is the yearly sheet that stores the repellent behind a film with tiny pores, so the repellent leaks out slowly for a year. Its face carries the dye square that fades as it runs out, and its bottom notch matches the grade selector.
- 18 Grade tabs
- This short coloured tab sticks up above the brow, blue for indoor and orange for veranda. It shows the grade at a glance and gives clean fingers something to hold at the swap.
- 20 Peel-off liner
- This clear non-stick film covers the treated face and the dye square until the sheet is in. Hands never touch the repellent.
- 22 Liner foot
- This is the stiff folded bottom of the liner, in two pieces either side of the grade notch. It holds the sheet 3 mm off the seat until the liner is pulled away.
- 24 Liner pull tab
- This is the top strip of the liner, which sticks out through the top slot. The adult pulls it to draw the whole liner off the face.
- 26 Rail lips
- These thin lips run in front of the sheet's side edges. They hold the sheet flat in its channels so it slides straight down.
- 30 Grade selectors
- This small key slides along the seat and locks for good at the indoor or the veranda end. It fits only into the notch of the matching sheet, so a strong veranda sheet cannot be fitted indoors.
- 10 Frame back plates (2)
- This is the flat rear moulding that sits on the wall or pole. It carries the rails, the seat, the grade selector and the fixing holes, and the front snaps onto it.
- 12 Frame fronts
- This is the grey front face of the shell, with the grille, the brow-like hood and the round window. Repellent drifts out through its slots, while fingers are kept off the sheet 5 mm behind them.
- 14 Window lenses
- This is a clear plastic disc pressed into the round window from inside. Through it the family sees the dye square and the grey bar, so they know when to swap the sheet.
- 16 Refill sheets (2)
- This is the yearly sheet that stores the repellent behind a film with tiny pores, so the repellent leaks out slowly for a year. Its face carries the dye square that fades as it runs out, and its bottom notch matches the grade selector.
- 18 Grade tabs
- This short coloured tab sticks up above the brow, blue for indoor and orange for veranda. It shows the grade at a glance and gives clean fingers something to hold at the swap.
- 10 Frame back plates (2)
- This is the flat rear moulding that sits on the wall or pole. It carries the rails, the seat, the grade selector and the fixing holes, and the front snaps onto it.
- 12 Frame fronts
- This is the grey front face of the shell, with the grille, the brow-like hood and the round window. Repellent drifts out through its slots, while fingers are kept off the sheet 5 mm behind them.
- 14 Window lenses
- This is a clear plastic disc pressed into the round window from inside. Through it the family sees the dye square and the grey bar, so they know when to swap the sheet.
- 16 Refill sheets (2)
- This is the yearly sheet that stores the repellent behind a film with tiny pores, so the repellent leaks out slowly for a year. Its face carries the dye square that fades as it runs out, and its bottom notch matches the grade selector.
- 18 Grade tabs
- This short coloured tab sticks up above the brow, blue for indoor and orange for veranda. It shows the grade at a glance and gives clean fingers something to hold at the swap.
- 26 Rail lips
- These thin lips run in front of the sheet's side edges. They hold the sheet flat in its channels so it slides straight down.
- 28 Locking seats
- This is the ledge near the bottom of the back plate that the sheet's bottom edge sits on. It puts the dye square right behind the window.
- 30 Grade selectors
- This small key slides along the seat and locks for good at the indoor or the veranda end. It fits only into the notch of the matching sheet, so a strong veranda sheet cannot be fitted indoors.
- 36 Pole strap
- This tough strap is threaded through two slots in the back plate and wraps round the pole. It holds the veranda frame tight on the breeze side and stays with the frame so it is not lost.
- 52 Veranda roof pole
- This is the post holding up the veranda roof. The second frame is strapped to it on the side the evening breeze comes from.
Every numbered part
| 10 | Frame back plates (2) This is the flat rear moulding that sits on the wall or pole. It carries the rails, the seat, the grade selector and the fixing holes, and the front snaps onto it. |
| 12 | Frame fronts This is the grey front face of the shell, with the grille, the brow-like hood and the round window. Repellent drifts out through its slots, while fingers are kept off the sheet 5 mm behind them. |
| 14 | Window lenses This is a clear plastic disc pressed into the round window from inside. Through it the family sees the dye square and the grey bar, so they know when to swap the sheet. |
| 16 | Refill sheets (2) This is the yearly sheet that stores the repellent behind a film with tiny pores, so the repellent leaks out slowly for a year. Its face carries the dye square that fades as it runs out, and its bottom notch matches the grade selector. |
| 18 | Grade tabs This short coloured tab sticks up above the brow, blue for indoor and orange for veranda. It shows the grade at a glance and gives clean fingers something to hold at the swap. |
| 20 | Peel-off liner This clear non-stick film covers the treated face and the dye square until the sheet is in. Hands never touch the repellent. |
| 22 | Liner foot This is the stiff folded bottom of the liner, in two pieces either side of the grade notch. It holds the sheet 3 mm off the seat until the liner is pulled away. |
| 24 | Liner pull tab This is the top strip of the liner, which sticks out through the top slot. The adult pulls it to draw the whole liner off the face. |
| 26 | Rail lips These thin lips run in front of the sheet's side edges. They hold the sheet flat in its channels so it slides straight down. |
| 28 | Locking seats This is the ledge near the bottom of the back plate that the sheet's bottom edge sits on. It puts the dye square right behind the window. |
| 30 | Grade selectors This small key slides along the seat and locks for good at the indoor or the veranda end. It fits only into the notch of the matching sheet, so a strong veranda sheet cannot be fitted indoors. |
| 32 | Wood screws These steel screws pass through the hidden holes in the back plate into plugs in the wall. They hold the frame firmly so it cannot fall or be pulled down. |
| 34 | Wall plugs These plastic sleeves sit in holes drilled in the block. They grip the screw threads so the screws hold in the wall. |
| 36 | Pole strap This tough strap is threaded through two slots in the back plate and wraps round the pole. It holds the veranda frame tight on the breeze side and stays with the frame so it is not lost. |
| 50 | Block wall This is the room wall the indoor frame is screwed to. Its face is the plane the frame's back sits flat against. |
| 52 | Veranda roof pole This is the post holding up the veranda roof. The second frame is strapped to it on the side the evening breeze comes from. |
Drawings
The sizes that decide whether the parts fit, for each feature where a fit or function depends on size. The patent drawings stay free of dimensions; the numbers in brackets are their part numerals.
| Feature | Size and tolerance | Datums | Finish and material | How it is checked |
|---|---|---|---|---|
| Sheet edges in side rails Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector, EVA store film blank The sheet must slide in easily and stay flat 5 mm behind the grille without rattling or binding. | 178 mm between rail bottoms, sheet 176 mm wide; rail channel 1.2 mm wide for a 0.6 mm sheet edge Rail gap ±0.3 mm; sheet width ±0.5 mm; channel +0.2/−0 mm Proposed | A: back face of back plate that sits on the wall B: locking seat at the bottom the sheet rests on C: centre plane between the rail channels | as moulded, smooth inside the rails Polypropylene; EVA and microporous film laminate | Go/no-go gauge for rail gap and channel width; optical check of die-cut sheet width |
| Grade selector key and sheet notch Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector, EVA store film blank The locked selector key must enter only its own grade's notch, so a wrong-grade sheet cannot drop onto the seat. | Selector key 3.0 mm wide, 4 mm tall; sheet notch 3.4 mm wide, 5 mm deep; indoor position 49 mm left and veranda position 47 mm right of the rail channel centre plane (datum C) Key and notch width ±0.1 mm; key height and notch depth ±0.2 mm; position ±0.2 mm Proposed | A: back face of back plate B: locking seat C: centre plane between the rail channels | as moulded Polypropylene; sheet laminate | Fixture with dummy indoor and veranda sheets; go/no-go gauge for selector key width (3.0 mm), height (4 mm) and thickness (1.1 mm); correct seating and 100 wrong-grade attempts with the selector locked, repeated after ageing equal to 5 years of sunlight and heat |
| Liner foot hold-up and final drop Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line, Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector The sheet must not click into its locked place while any part of the reinforced liner is left on the face. This is to be proven with liners torn on purpose. | Foot holds the sheet 3.0 mm above the seat while it stays joined, through the two reinforced side bands, to all liner film on the face; detent click at full drop only after the whole liner is out ±0.3 mm Proposed | B: locking seat A: back face of back plate | as moulded Siliconised PET liner; polypropylene | Fixture trials with intact, part-peeled and nearly removed liners, and with liners torn on purpose at several places. All 100 incomplete removals must stay unlocked and show liner colour in the window. |
| Front-to-back snap clips Frame front with grille, hood and window opening, Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector The halves must stay locked for 5 years in sun and heat, and the top slot gap must stay 2 mm. | 1.0 mm hook engagement, four clips ±0.1 mm Proposed | A: back face of back plate B: bottom edge of back plate C: centre plane between the rail channels | as moulded Polypropylene | Go/no-go gauge on the clip hook; pull-apart check after heat ageing |
| Grille set-back from sheet face Frame front with grille, hood and window opening, EVA store film blank This set-back keeps the test finger off the treated face and keeps airflow to the sheet steady. | 5.0 mm from inner grille face to sheet face ±0.5 mm Proposed | A: back face of back plate B: locking seat | as moulded Polypropylene | Depth gauge through the grille on an assembled frame with a dummy sheet |
| Window lens in front opening Window lens (14), Frame front with grille, hood and window opening The lens must stay put and clear so the dye can be read in one look. | Lens 20.0 mm diameter pressed from inside into a 19.7 mm bore behind the 18.4 mm viewing ledge, 0.15 to 0.30 mm interference Lens +0/−0.05 mm; bore +0.1/−0 mm Proposed | A: outer face of the front B: bottom edge of the front C: right edge of the front | Lens clear, polished tool, Ra 0.4 µm (Ra is surface roughness in millionths of a metre) Clear polypropylene | Pin gauge for the opening; optical check of the lens |
| Dye square under window Witness dye, reference bar ink and hidden symbol ink, Window lens (14) The dye square, the grey bar and the crossed-out mosquito symbol must all show fully in the window at every allowed sheet position. | To confirm | B: locking seat C: centre plane between the rail channels | as printed Dye in EVA store film; fade-proof ink | Optical check on seated dummy sheets at the extreme allowed positions. The clean and soot-covered 90-of-100 reading tests are then repeated. |
| Fixing holes Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector, Wood screw for plugs, Large backing washer The 4 mm screws and 3.5 mm nails must pass through, and the washer must bear on the plate. | 4.5 mm holes, 120 mm apart Hole +0.2/0 mm; spacing ±0.5 mm Proposed | A: back face of back plate B: locking seat | as moulded Polypropylene; zinc-plated steel | Pin gauge; drilling template check |
Tolerances follow ISO 1101:2017. Each value is proposed until the prototype shop confirms it.
Prototype quote: 200 units. 200 complete frame kits from a single-cavity aluminium prototype tool in production polypropylene: P1, P2, P3 lens, P8 strap and P9 spreader plates, plus P4 to P7 fixings bagged. Also 300 unloaded dummy sheets per grade (P10 with P12, P13 printing, P14 liner) and 100 dummy pouches, for fit, key, liner, lock, window and finger-probe trials. Includes first-article measurement of every size in this record. Loaded transfluthrin sheets (P11 dosing) are quoted separately by the patch converter for STORE, PACE and MARK testing.
Part drawings. One for each part made for this design, from the product record: its outer size and each feature's size, with tolerance and size id, its datums and the inspection frame. These are schematics, not fully toleranced drawings; feature positions are not shown.
Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: the record gives no length for the part.
Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs, Clip catches, four: the record gives no size for this groove.
Frame front with grille, hood and window opening: the record gives no length for the part.
Window lens, Lens rim (outside cylinder): the record gives no size for this pin.
Masonry nail: the record gives no width for the part.
Masonry nail, Nail shank: the record gives no size for this pin.
Releasable pole strap, Release catch: the record gives no size for this notch.
Spreader plate for crumbling mud (only in kits for weak walls): the record gives no width for the part.
EVA store film blank: the record gives no length for the part.
Transfluthrin, one sheet's load: the record gives no length for the part.
Rate-control film: the record gives no length for the part.
Rate-control film: the record gives no width for the part.
Witness dye, reference bar ink and hidden symbol ink: the record gives no length for the part.
Witness dye, reference bar ink and hidden symbol ink: the record gives no height or thickness for the part.
Foil pouch: the record gives no length for the part.
Foil pouch: the record gives no width for the part.
Foil pouch: the record gives no height or thickness for the part.
The system
What it must do
- Protects the room and sheltered veranda throughout the year.
Passes when: Each space shows at least 70% fewer landings than its untreated control at every required check. The lower result governs. The labelled wind limit is the highest sustained tested range that passes repeatedly, not the highest passing gust. - Keeps passive release useful across heat without moving controls.
Passes when: The framed hot-to-cool release ratio targets 1.5 and passes at 1.6 or below. The bare store control must reach at least 2.5. Every interval must also meet the useful-release requirement. The load is sized from the 35 degree result. A ratio above 1.6 opens the heat-slide review. - Stays fixed, exposed, and correctly aimed without daily care.
Passes when: Each fixing holds 50 newtons for 1 minute with less than 2 millimetres movement. At least 95 of 100 frames remain fixed, exposed, and correctly aimed at month 12. Tape, glue pads, loose hooks, and unsupported nails in crumbling mud are excluded. Pole mounting uses a captive ultraviolet-resistant strap or clamp. - Supports repeatable regional manufacture within the household price ceiling.
Passes when: The complete kit costs under $1 per household-year ex-factory. The working estimate remains $0.50: two $0.25 frames spread across 5 years equal $0.10; two $0.18 refills equal $0.36; packaging equals $0.04. Delivery, installation, collection, and disposal are reported separately. Guardian comparisons remain estimates because its public price is unavailable. Identical frames use keyed indoor and veranda refill grades because their air losses differ. - Keeps breathing exposure safe for sleeping people and pets.
Passes when: Every measured and calculated exposure stays below the documented limit for its covered group, with the assessment method and uncertainty recorded. No occupied-home trial starts before this result passes. - Shows replacement before useful mosquito protection ends.
Passes when: Every mark signals replacement by the last passing monthly check and before the first failing check. At least 90 of 100 readings are correct without words. The window shows a lasting comparison stripe and a crossed-out mosquito symbol after the dye fades. - Allows yearly replacement without touching the treated face.
Passes when: At least 95 of 100 adults finish correctly within 1 minute. Every hand wipe is below the method's stated detection limit. The frame shows the active mark only after full liner removal, and the grille keeps fingers away from the treated face. - Labels preserve bed net use and avoid unsupported disease claims.
Passes when: No label claims that the device replaces bed nets or protects against dengue. At least 90 of 100 users understand that bed nets remain needed, and at least 90 of 100 trial households continue reported and observed net use at each check.
Requirements
| ID | Requirement | Target | Test | Confidence |
|---|---|---|---|---|
| STORE-1 Must | Each grade carries the measured chemical amount needed for 12 months at 35 °C plus one spare month. The budget includes useful release, chemical left unusable in the sheet, leaks, chemical breakdown, and other measured losses. The sheet is packed for the hottest year, plus a month to spare, and it gives out about the same amount every day until the last weeks. Holding the repellent | Set each grade’s load from its measured framed release at 35 °C over 12 months plus one spare month. Release at 35 °C stays within 10% of its month-1 value through month 11. Verify monthly at 25, 30 and 35 °C by whole-sheet weighing and chemical analysis of matched sheets, then continue through the spare month. | Weigh whole framed sheets every month for 12 months at 25, 30 and 35 °C. Each month, cut matched sheets and measure the transfluthrin left by chemical analysis, because weight loss can also include other substances. | Medium calculated Source: Let r be the framed release at 25 °C in milligrams per day. At the 1.5 ratio target, the 35 °C rate is 1.5 r. Twelve months plus one spare month is 395 days, so 395 days x 1.5 r = 593 r. A saturated store keeps a leftover that cannot leave, judged at 15%: 593 r x 1.15 = 682 r. If the measured ratio is 1.6, the load is 395 x 1.6 r x 1.15 = 727 r, about 7% more chemical. The value of r itself waits on the effective air level, which no public source in this pass gives. |
| STORE-2 Must | The storage layer holds transfluthrin without visible pooling, running, or leakage at the sealed edges. Even on the hottest days, no wet chemical appears on the sheet or its edges. Holding the repellent | No visible liquid, and total transfluthrin recovered from edge wipes, corrected by the wipe method’s measured recovery, stays under 1% of the load after 30 days at 40 °C and after 12 months at 35 °C. Test 30 sealed and 30 opened sheets at each condition. | Hang 30 sealed and 30 opened sheets upright at 40 °C and at 35 °C. Inspect the edges weekly and wipe them with an absorbent pad for chemical analysis. | Medium assumed |
| PACE-1 Must | Measure framed and bare-store release at matching ages and stated airflow. Record when a bare control runs out or falls below the useful-release requirement. On a 35 °C day the sheet gives off at most about one and a half times what it gives on a 25 °C day. Letting it out slowly | The framed hot-to-cool release ratio targets 1.5 and passes at 1.6 or below. The bare store control must reach at least 2.5. Every interval must also meet the useful-release requirement. The load is sized from the 35 degree result. A ratio above 1.6 opens the heat-slide review. | Age framed sheets and bare store pieces side by side at 25, 30 and 35 °C for 12 months. Measure monthly transfluthrin release by weighing plus chemical analysis. | Low calculated Source: The Clausius-Clapeyron rule says evaporation scales as exp(-E/RT). Here E is the energy needed to evaporate one mole of chemical, R = 8.314 J/(mol K), and T is temperature in kelvin. The step from 25 °C to 35 °C is 1/298.15 - 1/308.15 = 0.00010884 per kelvin. For a semi-volatile pyrethroid, E is judged at 80 to 100 kJ/mol (an estimate). That gives exp(80000/8.314 x 0.00010884) = exp(1.047) = 2.85 and exp(100000/8.314 x 0.00010884) = exp(1.309) = 3.70. So a bare surface rises about 2.9 to 3.7 times. A film with open air-filled pores still follows vapour pressure, so it stays near that range. A film the chemical crosses while dissolved in plastic follows its own crossing energy instead. A ratio of 1.5 needs a crossing energy of ln(1.5)/0.00010884 x 8.314 = 31 kJ/mol or less. A ratio of 1.6 allows ln(1.6)/0.00010884 x 8.314 = 36 kJ/mol. The bare-store pass of 2.5 matches E of about 70 kJ/mol. The 1.5 is a target. An earlier draft took it from a fragrance-diffuser maker's web guide, which measured a different temperature span with no pore film, so it is not used as a fact here. |
| PACE-2 Must | Test the indoor and veranda grades in their intended spaces, both units operating together, measured air movement between spaces, startup peaks, aged sheets, sleeping height, child height, and each covered pet’s breathing height. Name every covered group and its documented limit before testing. Even a brand-new sheet on the hottest night, in a shut room, keeps the air safe to breathe for a sleeping child. Letting it out slowly | Every measured and calculated exposure stays below the documented limit for its covered group, with the assessment method and uncertainty recorded. No occupied-home trial starts before this result passes. | A test facility recognised for WHO prequalification work and run under good laboratory practice (strict rules for lab records), such as Ifakara Health Institute in Tanzania, which the inventor's digest names as an established test site, samples air in nanograms per litre (billionths of a gram in each litre of air). Qualified assessors then run an inhalation exposure assessment. | Medium assumed |
| PACE-3 Must | Test opened units from startup through month 12 in the 30 m3 room and roofed, side-sheltered 10 m2 veranda. Set the mosquito groups, untreated controls, repeat count, sustained-wind averaging time, and stopping rules before testing. At the end of a hot year, at least 7 of every 10 mosquito landings are stopped, indoors and on the veranda. Letting it out slowly | Each space shows at least 70% fewer landings than its untreated control at every required check. The lower result governs. The labelled wind limit is the highest sustained tested range that passes repeatedly, not the highest passing gust. | Semi-field chambers at a recognised test facility. Wind is logged every 5 minutes at 1 to 4 metres height beside the unit. Air is sampled at 1 to 4 metres from the unit. Run repeated wind directions across the veranda. | Low calculated Source: Air that leaves carries repellent away. Room: 30 m3 x 5 air changes per hour (a judgment for homes with open eaves) = 150 m3/h. Veranda: a 2 m x 2 m open side with a 0.5 m/s breeze passes 4 m2 x 0.5 m/s = 2 m3/s = 7,200 m3/h. That is 7,200/150 = 48 times more air through the veranda. The breeze crosses 3 m in 3/0.5 = 6 seconds. So the veranda unit must release many times more than the indoor unit, or sit where the breeze carries its vapour over the seats. The side shelter must slow the breeze for one framed sheet to have a chance. These are estimates, and only landing tests settle them. |
| PACE-4 Must | Use one identical frame body with a captive installation selector set permanently to indoor or veranda. Blue marks the indoor grade and orange marks the veranda grade. The wrong grade must not seat after the selector is set. The veranda sheet works harder but still fits the same frame and the same budget. Letting it out slowly | The veranda grade reaches the release that passes PACE-3 at the labelled wind limit within the usable refill opening inside the 200 mm x 150 mm frame. | Measure veranda-grade release at 25 and 35 °C and in a still versus a 0.5 m/s airstream. Try each grade in the wrong frame position to confirm the key works. | Low assumed |
| PACE-5 Should | Set a separate useful-release value for each grade from paired chemical-release measurements and passing landing tests at its allowed airflow limits. No month dips below the amount that keeps mosquitoes off. Letting it out slowly | Monthly transfluthrin release at 25, 30 and 35 °C stays at or above the useful-release value of record every month. Weight loss and chemical analysis agree within 10% after measured loss of other substances, leakage, and chemical breakdown is removed from the comparison. | Weigh whole framed sheets at fixed intervals and divide total loss by test days. Each month, analyse sister sheets for chemical left. | Medium assumed |
| MARK-1 Must | Pair every mark reading with the landing result for the same grade, age, heat, airflow, and soot condition from startup through actual failure. The window says 'replace' before the protection runs out, and never more than a month late. Showing when to swap | Every mark signals replacement by the last passing monthly check and before the first failing check. At least 90 of 100 readings are correct without words. The window shows a lasting comparison stripe and a crossed-out mosquito symbol after the dye fades. | Age paired sheets and marks for 12 months at 25, 30 and 35 °C, clean and under set amounts of soot. Read the marks against landing tests at months 9 to 12, and carry runs on through real failure. Dye and film thickness are chosen from these runs. | Medium assumed |
| MARK-2 Should | Anyone can read the mark in one look, with no words, even with soot on the grille. Nine in ten people tell 'working' from 'replace' at a glance. Showing when to swap | At least 90 of 100 readings are correct without words. The window shows a lasting comparison stripe and a crossed-out mosquito symbol after the dye fades. The window is a 20 mm clear lens at the lower right, below the hood's shadow and outside the grille. | Reading test with 100 adults in target districts, using fresh, near-spent and spent sheets, in daylight and lamplight, with and without soot. | Medium calculated Source: S106. Rests on the 10 mm seat once the liner is fully out. The dye centre then sits at 10 + 12 = 22 mm, matching the window centre (MARK-2). |
| MARK-3 Must | Test intact, partly peeled, nearly removed, and torn liners. The active mark appears only when the complete liner has left the release face. A sheet that is still half covered can never look like it is working. Showing when to swap | In 100 of 100 tested incomplete-liner fits, the window shows liner colour and no blue dye. The frame shows the active mark only after full liner removal, and the grille keeps fingers away from the treated face. | Fit sheets with the liner pulled 0%, 50%, 90% and 100%, and record what the window shows. | Medium assumed |
| FIX-1 Should | Remove the note about the undecided installer. Test every approved fixing when installed by each permitted installer group, and record the installer route on the field result. Each fixing holds the pull of a 5 kg bag hanging on it, and 95 of 100 frames are still in place after a year. Staying on the wall and pole | Each fixing holds 50 newtons for 1 minute with less than 2 millimetres movement. At least 95 of 100 frames remain fixed, exposed, and correctly aimed at month 12. | Pull tests on each labelled wall and pole type, then knock, heat, damp and sunlight tests, then a 100-home check at month 12. The pass holds whether a delivery team or the household fixes the frame. Debbie has not recorded a decision on who fixes. | Medium calculated Source: One newton is about the weight of 100 grams. The frame plus sheet is judged at about 60 g, a weight of 0.6 N. 50 N / 0.6 N is about 83 times the unit's own weight, which covers a child's tug or a bag hung on it. |
| FIX-2 Should | Keep the listed block, firm-mud, and crumbling-mud fixings only where each passes FIX-1. Mark every untested surface as do not fit. There is a fixing for every common wall and pole, and none of them peels or falls off. Staying on the wall and pole | Tape, glue pads, loose hooks, and unsupported nails in crumbling mud are excluded. Pole mounting uses a captive ultraviolet-resistant strap or clamp. | Pull and 12-month field tests per surface type, with any unlisted surface marked 'do not fit'. | Medium assumed |
| FIX-3 Must | The indoor frame sits at seated head height. The veranda frame sits on the breeze side at about standing eye height, with its window facing the seats. Each unit is where its vapour reaches the people and where they can see the window. Staying on the wall and pole | Indoor: about 1.1 m above the floor and at least 1 m from the cooking fire. Veranda: about 1.5 m high on the pole facing the incoming evening breeze, with the window facing the seats. | Map air levels and landings across the 10 m2 veranda for each placement. Check window visibility from each seat. | Medium assumed |
| SHELL-1 Should | Use a named finger-access test with stated probe dimensions and force. Choose slot shape, depth, and internal blocks so the test probe does not reach the treated face. A child's finger cannot reach the treated sheet. Guarding and shielding | The standard jointed test finger cannot touch the sheet. Keep slots 2.5 mm wide and the sheet 5 mm behind them only if the complete frame passes the named probe test. | Probe every slot with the jointed test finger and a small 3 mm probe, and confirm no contact. | High published Source: IEC 61032, the international standard for test probes that check whether fingers can reach inside an enclosure. |
| SHELL-2 Must | Define soot mass, particle source, exposure time, airflow, humidity, and cleaning state before testing clean and dirty frames. Smoke from the cooking fire does not choke the sheet. Guarding and shielding | Grille open area stays at least 40% of the usable sheet face. After the recorded soot exposure, release stays within 20% of a clean sheet, and the dirty unit still passes PACE-3, PACE-5, MARK-1 and MARK-2. | Expose framed sheets to measured soot loads in a test room, then measure release and read the marks. | Medium assumed |
| SHELL-3 Should | The covered sheet is held securely behind the grille before peeling. Final locking occurs only after the liner is fully removed. A half-peeled sheet will not lock in, so the household notices straight away. Guarding and shielding | In 100 of 100 trials, a sheet with any liner left does not click into its final locked position. Test intact, partly removed, nearly removed, and torn liners. | Fit trials with the liner partly and fully removed. | Medium assumed |
| SHELL-4 Should | Document how the accelerated sunlight and heat exposure represents 5 years in each intended climate. After ageing, repeat clip, pull, window-reading, and grade-key tests. The same frame works for five yearly sheets. Guarding and shielding | Frame life value of record 5 years (estimate). After accelerated sunlight and heat ageing equal to 5 years, the frame passes FIX-1 and MARK-2, the clips retain the refill, and the grade key still rejects the wrong refill. | Accelerated weathering of UV-stabilised polypropylene frames, followed by clip and pull tests. | Medium estimated Source: Coloured, UV-stabilised polypropylene parts commonly last several years outdoors. A 4 to 7 year range is judged, with 5 years as the value of record. (compared with Buckets and outdoor polypropylene goods, which differ in that this frame sits shaded under a roof.) |
| SWAP-1 Should | Adults swap the sheet quickly without touching the treated face. Almost everyone does the yearly swap in under a minute, with clean hands afterwards. Sealing and swapping each year | At least 95 of 100 adults finish correctly within 1 minute. Every hand wipe is below the method's stated detection limit. | A timed swap trial with 100 adults, run by a qualified team, with hand wipes analysed for transfluthrin. | Medium assumed |
| SWAP-2 Should | The sealed pouch keeps the sheet full during storage and shipping. A sheet stored for two years in a hot warehouse works like a new one. Sealing and swapping each year | Loss inside the pouch under 1% of the load after 2 years at 35 °C. The sheet then still passes PACE-3. | Store pouches at 35 °C. Weigh them and analyse the sheets at 6, 12 and 24 months. | Medium estimated Source: Foil laminate pouches are near-sealed to vapour. A loss of 0.2 to 1% over 2 years is judged. (compared with Foil sachets used for medicine skin patches, which differ in that this sheet is larger and sits in hotter storage.) |
| SWAP-3 Must | Labels and hand-out messages keep families using bed nets and make no dengue claim. People keep sleeping under their nets. Sealing and swapping each year | No label claims that the device replaces bed nets or protects against dengue. At least 90 of 100 users understand that bed nets remain needed. At least 90 of 100 trial households continue reported and observed net use at each check. | Review label text, run comprehension interviews, and observe net use at each trial visit. | Medium assumed |
| SWAP-4 Should | Spent sheets go back through the campaign channel that brings the new ones. Most old sheets come back to the firm. Sealing and swapping each year | Return rate measured and reported each year, aiming at 80% (a judgment). Spent sheets are re-pouched at hand-in. | Count sheets handed out and returned per district. | Medium assumed |
| MAKE-1 Should | Obtain independent quotes from regional moulders and from patch, label, or textile firms that demonstrate chemical loading, film joining, edge sealing, pouch sealing, and release testing at the stated volume. A year of protection for both spaces costs the buyer less than a dollar at the factory gate. Building it the same every time | The complete kit costs under $1 per household-year ex-factory. The working estimate remains $0.50: two $0.25 frames spread across 5 years equal $0.10; two $0.18 refills equal $0.36; packaging equals $0.04. Delivery, installation, collection, and disposal are reported separately. Guardian comparisons remain estimates because its public price is unavailable. | Independent quotes from regional moulders and net makers at stated volumes, reconciled against pilot-lot yield and chemical use. | Medium calculated Source: 2 frames x $0.25 / 5 years = $0.10. 2 sheets x $0.18 = $0.36. Two pouches = $0.04. $0.10 + $0.36 + $0.04 = $0.50. That leaves $1.00 - $0.50 = $0.50 headroom for production loss, quality checks and maker margin. Every input is an estimate with no supplier quote. |
| MAKE-2 Should | Define release spread for each grade at stated temperatures and ages. Specify the seal-leak method and detection limit. Require the lowest and highest allowed production results to pass useful-release and breathing-exposure limits. Every sheet from every maker behaves the same. Building it the same every time | Load within plus or minus 10% of the value of record. Release spread within plus or minus 15% across a pilot lot. Zero seal leaks in 200 sampled sheets. Retained shelf samples kept from every lot. | Pilot lots at a qualified patch or label converter, then the same open process at regional firms. Measure loading spread, leaks, release spread and rejects. | Medium assumed |
| MAKE-3 Should | One value of record is kept for every key number and quoted the same everywhere. Every maker and every test works to the same numbers. Building it the same every time | The open spec lists: effective air level, release rate per grade, load per grade, hot-to-cool ratio target 1.5 (pass at 1.6 or below), sheet cost $0.18 (estimate), frame life 5 years (estimate), and kit under $1 per household per year ex-factory with $0.50 as a sub-budget estimate. | Audit every document and label against the list before release. | Medium assumed |
| SYS-1 Must | Both units protect their spaces at the end of a hot year, and the weaker result decides. Seven of ten landings stopped, indoors and out, after a year. Whole product | At least 70% fewer mosquito landings than an untreated control at month 12 after 12 months at 35 °C, in the 30 m3 room chamber and under the roofed, side-sheltered 10 m2 veranda at a logged wind speed. | Checked through STORE-1, PACE-1, PACE-3, PACE-4, SHELL-2, FIX-3 | |
| SYS-2 Must | Safety gate for the dominant failure: release falling in heat, soot or wind while the mark still looks fresh. No home trial until tests show the window never says 'working' on a dead unit. Whole product | Month-12 landing tests plus 12-month paired dye-square ageing at 25, 30 and 35 °C, clean and sooted, must pass before any occupied-home trial. Review goes through a test facility recognised for WHO prequalification work, plus an inhalation exposure assessment. | Checked through MARK-1, MARK-3, SHELL-3, PACE-2, PACE-5 | |
| SYS-3 Must | The household kit stays under the price ceiling with all units counted. Less than a dollar a year for both units and their sheets. Whole product | Under $1 per household per year ex-factory, with $0.50 as the parts sub-budget estimate. | Checked through MAKE-1, STORE-1, PACE-4, SHELL-4, SWAP-2 | |
| SYS-4 Must | No power, heat, smoke or moving part. Nothing to plug in, light or jam. Whole product | Zero moving parts and zero energy inputs in the base unit. The heat-slide opens only if the framed ratio exceeds 1.6 or the sheet pair exceeds $0.40. | Checked through PACE-1, SHELL-2, MARK-1 | |
| MDO-1 Must | Sealed shelf life, hot transport, pouch puncture, and storage leakage did not fit within eight must-dos. It didn't fit in the must-dos, so it is carried here. Whole product | As the must-dos panel stated | To confirm | |
| MDO-2 Must | Spent-refill collection and disposal need a separate campaign and environmental gate. It didn't fit in the must-dos, so it is carried here. Whole product | As the must-dos panel stated | To confirm | |
| MDO-3 Must | Patent-family status in Tanzania, India, and Nigeria remains unchecked; public-domain release does not grant manufacturing freedom. It didn't fit in the must-dos, so it is carried here. Whole product | As the must-dos panel stated | To confirm | |
| MDO-4 Must | The invention-slot register remains unavailable, so unused-ground claims remain unsettled. It didn't fit in the must-dos, so it is carried here. Whole product | As the must-dos panel stated | To confirm | |
| MDO-5 Must | Delivery, fitting, collection, approval, and disposal sit outside the settled ex-factory ceiling and need a delivered-cost case. It didn't fit in the must-dos, so it is carried here. Whole product | As the must-dos panel stated | To confirm | |
| MDO-6 Must | Full infection reduction, public-health impact, and dengue claims require studies beyond landing tests. It didn't fit in the must-dos, so it is carried here. Whole product | As the must-dos panel stated | To confirm |
Specification
Holding the repellent
| STORE-1 Chemical load per grade | Set from measured framed release at 35°C over 12 months plus 1 month; release at 35°C stays within 10% of the month-1 value through month 11; at the 1.5 times (release at 35 °C ÷ release at 25 °C) target this is about 19.5 months of minimum useful release; includes unusable, leaked and broken-down chemical as measured |
| STORE-2 No pooling or edge leak | No visible liquid; edge wipes under 1% of load, from wipe tests after 30 days at 40 °C and 12 months at 35 °C, 30 sealed and 30 opened sheets each test conditions |
Letting it out slowly
| PACE-1 Heat flattening | Framed ratio target 1.5 times (release at 35 °C ÷ release at 25 °C), pass 1.6 times or below; bare store control at least 2.5 times; above 1.6 times opens the heat-slide review |
| PACE-2 Breathing exposure | Every measured and calculated exposure below the documented limit for each covered group (sleepers, children, pets) fresh sheets at 35 °C for the startup peak plus aged sheets, with both units running in the room and the veranda; air movement between the two spaces measured; air sampled at 1 hour and 5 hours after start, 1 to 4 m from each unit, at sleeping height, child breathing height, seated height and each covered pet's breathing height; air level given in ng/L (nanograms per litre, billionths of a gram in each litre of air); wind logged separately beside the veranda unit; reviewed by a WHO-prequalification-recognised test facility under good laboratory practice (strict rules for lab records) plus an inhalation exposure assessment; no occupied-home trial before it passes |
| PACE-3 Landing cut in both spaces | at least 70% fewer landings in the 30 m3 (cubic metres of room air) room chamber and under the roofed, side-sheltered 10 m2 (square metres of floor) veranda at every required check; lower result governs; log wind direction and wind strength in m/s with a wireless logger at 1 to 4 m height beside the veranda unit every 5 minutes; calculate sustained wind as a 30-minute moving average; sample air separately at 1 hour and 5 hours after start, 1 to 4 m from each unit, at 0.5 m above the ground and at seated height, and report concentration in ng/L (nanograms per litre); labelled wind limit is the highest sustained tested range that passes repeatedly |
| PACE-4 Grade key and veranda grade | Identical frames; one breakaway rib left sets indoor (blue) or veranda (orange); wrong grade cannot seat; veranda release measured at 25°C (degrees Celsius) and 35°C, still air against 0.5 m/s (metres per second), against still air; inside 200 × 150 mm; parts estimate stays 0.50 $ per household per year |
| PACE-5 Useful release every month | Monthly release at 25°C (degrees Celsius), 30 and 35 °C at or above each grade's useful-release value of record; weight loss and chemical analysis agree within 10% |
Showing when to swap
| MARK-1 Mark tied to protection | Signals by the last passing monthly check and before the first failing one, within 30 days; pair mark readings and landing results at startup and every month through actual failure for each grade at 25 °C, 30 °C and 35 °C, at each stated airflow and soot condition |
| MARK-2 Readable at a glance | at least 90 of 100 readings; 20 mm window at lower right, below the hood shadow and outside the grille; fade-proof grey bar and crossed-out mosquito |
| MARK-3 Mark appears only with liner off | Test intact, partly removed, nearly removed, fully removed and deliberately torn liners, including detached fragments left away from the window; 100 of 100 fits with any liner remaining on the release face show liner colour, show no blue dye and stay unlocked |
Staying on the wall and pole
| FIX-1 Fixing strength | Each fixing holds 50 N for 1 minute with under 2 mm movement; at least 95 of 100 frames remain fixed, exposed and correctly aimed at month 12; installer route recorded per home |
| FIX-2 Allowed surfaces | Block: screws and plugs. Firm mud: long nails with large washers. Crumbling mud: spreader plate with nails, kept only if it passes FIX-1, otherwise marked do not fit. Poles: releasable UV-resistant strap held in the frame slots. No tape, glue pads or loose hooks |
| FIX-3 Placement | Indoor about 1.1 m above the floor, at least 1 m from the cooking fire; veranda about 1.5 m on the breeze-side pole on the breeze side, window facing the seats |
Guarding and shielding
| SHELL-1 Finger guard | Two probes must not touch the sheet. The first is the jointed test finger, IEC 61032 test probe B (12 mm across, 80 mm long), pushed with 10 N (newtons; 1 N is about the weight of 100 g). The second is a straight rigid rod 3.0 mm across with a flat end, pushed with 3 N. Slots are 2.5 mm ±0.1 mm wide, so the widest slot of 2.6 mm is narrower than the 3.0 mm rod. The sheet sits 5 mm behind the slots. Both are kept only if the complete frame passes both probes. |
| SHELL-2 Soot | Grille open area at least 40% of usable sheet face; release within 20% of a clean sheet after recorded soot; dirty unit still passes PACE-3, PACE-5, MARK-1, MARK-2 |
| SHELL-3 Final lock unavailable with any intact or torn liner remaining | Test intact, partly removed, nearly removed, fully removed and deliberately torn liners, including detached fragments left away from the window; 100 of 100 fits with any liner remaining on the release face show liner colour, show no blue dye and stay unlocked |
| SHELL-4 Frame life | 5 years of accelerated sunlight and heat, then passes FIX-1 and MARK-2, clips hold, key still rejects the wrong grade |
Sealing and swapping
| SWAP-1 Clean swap | at least 95 of 100 adults within 1 minute; every hand wipe below the method's stated detection limit |
| SWAP-2 Shelf life | under 1% of load after 2 years at 35 °C; sheet then passes PACE-3 |
| SWAP-3 Bed-net and claim wording | No claim to replace nets or protect against dengue; at least 90 of 100 users understand nets stay needed; at least 90 of 100 trial households continue reported and observed net use at each check |
| SWAP-4 Return | Return rate reported yearly, aiming at 80% of sheets handed out; spent sheets re-pouched at hand-in |
Building it the same every time
| MAKE-1 Cost | Kit under 1.00 $ per household per year ex-factory; parts estimate 0.50 $ per household per year = 0.10 $ per household per year + 0.36 $ per household per year + 0.04 $ per household per year; delivery, fitting, collection and disposal reported separately; any Guardian comparison labelled an estimate |
| MAKE-2 Batch control | Load plus or minus 10% of the value of record; release spread plus or minus 15%; zero leaks in 200 sampled sheets; retained samples from every lot |
| MAKE-3 One value of record | Open spec lists effective air level, release per grade, load per grade, ratio target 1.5 times (release at 35 °C ÷ release at 25 °C) with pass 1.6 times or below, sheet cost 0.18 $ per sheet, frame life 5 years, kit under 1.00 $ per household per year with 0.50 $ per household per year as sub-budget |
Whole system
| SYS-1 Year-end protection | at least 70% fewer landings after 12 months at 35°C, room and veranda, weaker result decides |
| SYS-2 Safety gate for the main failure | Year-end landing tests plus twelve-month paired dye ageing at 25°C (degrees Celsius), 30 and 35 °C, clean and sooted, through a WHO-prequalification-recognised facility plus an inhalation exposure assessment, before any occupied-home trial |
| SYS-3 Price ceiling | under 1.00 $ per household per year ex-factory, 0.50 $ per household per year sub-budget |
| SYS-4 No power or moving parts | Zero moving parts and zero energy inputs; the heat-slide review opens if the framed ratio is above 1.6 times; separately, it opens if a sheet pair costs more than $0.40 per household per year |
| MDO-1 Shelf and transport | Covered by SWAP-2 plus puncture and hot-transport tests on pouched sheets |
| MDO-2 Collection and disposal | Separate campaign plan and environmental review for spent sheets |
| MDO-3 Patent status | Legal status checked in Tanzania, India and Nigeria before production |
| MDO-4 Invention slot register | Obtained and checked before claiming unused ground |
| MDO-5 Delivered cost | Delivery, fitting, collection, approval and disposal costed outside under 1.00 $ per household per year |
| MDO-6 Health claims | Keep infection-reduction claims off the label unless separately supported and approved; keep dengue protection claims off the label with no studies exception to MD-8 |
Design numbers and their basis
Every number the design uses, once, with where it came from. Estimated and assumed numbers are provisional until a test confirms them.
| ID | Number | Value | Basis | Source |
|---|---|---|---|---|
| Q-1 | indoor room air volume served | 30 m3 (cubic metres of room air) | From the brief | Design target in the inventor's digest |
| Q-2 | veranda floor area served | 10 m2 (square metres of floor), roofed and side-sheltered | From the brief | Design target in the inventor's digest; person chose sheltered verandas first |
| Q-3 | useful life of one sheet | 12 months | From the brief | Design target in the inventor's digest |
| Q-4 | cool end of rated temperature range | 25 °C (degrees Celsius) | From the brief | Design target, 25-35 °C |
| Q-5 | hot end of rated temperature range | 35 °C | From the brief | Design target, 25-35 °C |
| Q-6 | minimum cut in mosquito landings against an untreated control | at least 70 % fewer landings | From the brief | Pass test in the brief, at month 12 after 12 months at 35 °C |
| Q-7 | longest delay between losing the landing cut and the mark changing | 30 days | From the brief | Required quantity: mark changes within 30 days of the month the 70% cut is first lost |
| Q-8 | household kit price ceiling, ex-factory (price at the factory gate) | under 1.00 $ per household per year | From the brief | Unit cost target: under $1 per household per year, all devices and refills counted |
| Q-9 | parts, chemical and packaging sub-budget | 0.50 $ per household per year | Calculated | Q-13 + Q-14 + Q-15 = 0.10 + 0.36 + 0.04 = 0.50; an estimate inside Q-8, not a second target |
| Q-10 | cost of one sealed yearly sheet, without its pouch | 0.18 $ per sheet | Estimated | Judgment, no supplier quote: store film with chemical 0.10 + pore film 0.04 + mark 0.01 + liner and converting 0.03 = 0.18 |
| Q-11 | cost of one frame with its fixing bag | 0.25 $ per frame | Estimated | Judgment at 1 million frames a year: two mouldings and lens 0.22 + fixings 0.03 = 0.25 |
| Q-12 | frame life on the wall | 5 years | Estimated | Judgment; confirmed by accelerated sunlight and heat ageing under SHELL-4 |
| Q-13 | frame cost per household per year | 0.10 $ per household per year | Calculated | 2 frames × Q-11 0.25 ÷ Q-12 5 years = 0.10 |
| Q-14 | sheet pair cost per household per year | 0.36 $ per household per year | Calculated | 2 sheets × Q-10 0.18 = 0.36 |
| Q-15 | packaging per household per year | 0.04 $ per household per year | Estimated | Judgment: two foil pouches at 0.02 each = 0.04 |
| Q-16 | hot-to-cool release ratio target, framed sheet | 1.5 times (release at 35 °C ÷ release at 25 °C) | From the brief | A target set by the person, not a measured fact |
| Q-17 | hot-to-cool release ratio pass limit, framed sheet | 1.6 or below times | From the brief | Debbie's gate: above 1.6 opens the heat-slide review |
| Q-18 | hot-to-cool ratio a bare store control must show | at least 2.5 times | From the brief | Requirement PACE-1; proves the film, and nothing else, did the flattening |
| Q-19 | free evaporation rise from 25 to 35 °C | about 2.9 to 3.7 times | Calculated | Clausius-Clapeyron: e^[(H ÷ 8.314) × (1/298.15 − 1/308.15)]; bracket = 0.0001088 per kelvin; H = 80 kJ/mol gives e^1.047 = 2.85; H = 100 kJ/mol gives e^1.309 = 3.70 |
| Q-20 | heat of evaporation assumed for transfluthrin | about 80 to 100 kJ/mol | Estimated | Typical range for a semi-volatile pyrethroid; an estimate, to be replaced by measurement |
| Q-21 | heat sensitivity the slowest step may have for the 1.5 target | about 31 kJ/mol (apparent activation energy) | Calculated | ln 1.5 = 0.405; 0.405 ÷ 0.0001088 × 8.314 = about 31,000 J/mol |
| Q-22 | heat sensitivity the slowest step may have for the 1.6 pass | about 36 kJ/mol | Calculated | ln 1.6 = 0.470; 0.470 ÷ 0.0001088 × 8.314 = about 36,000 J/mol |
| Q-23 | spare running time added to the load | 1 month | Assumed | Judgment in the design basis, to be fixed by test |
| Q-24 | load at the 1.5 target, in months of minimum useful release | 19.5 months of minimum useful release | Calculated | 13 months × 1.5 × minimum monthly release = 19.5 |
| Q-25 | load with no heat flattening | 42.9 (2.2 times the target load) months of minimum useful release | Calculated | 13 × 3.3 = 42.9; 42.9 ÷ 19.5 = 2.2 |
| Q-26 | chemical left at swap in a cool home, at the 1.5 target | 38 % of load | Calculated | (19.5 − 12) ÷ 19.5 = 7.5 ÷ 19.5 = 38% |
| Q-27 | chemical left at swap in a cool home, no flattening | 72 % of load | Calculated | (42.9 − 12) ÷ 42.9 = 30.9 ÷ 42.9 = 72% |
| Q-28 | release flatness at 35 °C | within 10% of the month-1 value through month 11 % | From the brief | Requirement STORE-1 |
| Q-29 | chemical allowed at sealed edges | under 1 % of load, from wipe tests | From the brief | Requirement STORE-2 |
| Q-30 | edge leak test | 30 days at 40 °C and 12 months at 35 °C, 30 sealed and 30 opened sheets each test conditions | From the brief | Requirement STORE-2 |
| Q-31 | frame face size | 200 × 150 mm wide × mm tall | From the brief | Design basis industrial design |
| Q-32 | frame depth | 28 at the hood, 14 at the bottom mm | From the brief | Design basis industrial design |
| Q-33 | grille slot width | 3 mm mm | From the brief | Design basis; kept only if the finger-probe test passes (SHELL-1) |
| Q-34 | gap from grille to treated face | 5 mm mm | From the brief | Design basis; kept only if the finger-probe test passes (SHELL-1) |
| Q-35 | indicator window diameter | 20 mm mm | From the brief | Design basis; lower right, outside the grille |
| Q-36 | grille open area | at least 40 % of usable sheet face | From the brief | Requirement SHELL-2 |
| Q-37 | release allowed loss under recorded soot | within 20 % of a clean sheet | From the brief | Requirement SHELL-2 |
| Q-38 | fixing pull test | 50 N for 1 minute with under 2 mm movement newtons (a newton is about the weight of a 100 g apple) | From the brief | Requirement FIX-1 |
| Q-39 | frames still fixed, exposed and aimed at month 12 | at least 95 of 100 frames | From the brief | Requirement FIX-1 |
| Q-40 | indoor mounting position | about 1.1 m above the floor, at least 1 m from the cooking fire m | From the brief | Requirement FIX-3 |
| Q-41 | veranda mounting height | about 1.5 m on the breeze-side pole | From the brief | Requirement FIX-3 |
| Q-42 | swap task pass | at least 95 of 100 adults within 1 minute adults | From the brief | Requirement SWAP-1 |
| Q-43 | loss inside a sealed pouch | under 1% of load after 2 years at 35 °C % of load | From the brief | Requirement SWAP-2 |
| Q-44 | mark readings correct without words | at least 90 of 100 readings | From the brief | Requirements MARK-1 and MARK-2 |
| Q-45 | bed-net understanding and use | at least 90 of 100 users understand nets stay needed; at least 90 of 100 trial households keep using nets people and households | From the brief | Requirement SWAP-3 |
| Q-46 | spent-sheet return aim | 80 % of sheets handed out | Estimated | Judgment in requirement SWAP-4 |
| Q-47 | load tolerance per sheet | plus or minus 10 % of the value of record | From the brief | Requirement MAKE-2 |
| Q-48 | release spread across a pilot lot | plus or minus 15 % | From the brief | Requirement MAKE-2 |
| Q-49 | seal sampling pass | zero leaks in 200 sampled sheets sheets | From the brief | Requirement MAKE-2 |
| Q-50 | field measurement method | wind logged every 5 minutes at 1 to 4 m height; air sampled 1 to 4 m from the unit in nanograms per litre minutes, metres, ng/L (billionths of a gram per litre of air) | Published | Published trial plan for Mossie-GO, a solar fan repellent device, in the journal Trials |
| Q-51 | room fresh-air flow | 30 to 150 m3 per hour | Calculated | 30 m3 × 1 to 5 air changes an hour (air changes assumed) = 30 to 150 |
| Q-52 | veranda air flow through the open side | 2,700 to 13,500 m3 per hour | Calculated | Assumed 7.5 m2 open side × 0.1 to 0.5 m/s = 0.75 to 3.75 m3/s = 2,700 to 13,500 m3/h |
| Q-53 | veranda-to-room release gap if air mixed evenly | about 18 to 450 times | Calculated | 2,700 ÷ 150 = 18; 13,500 ÷ 30 = 450 |
| Q-54 | time for the breeze to cross the veranda | about 6 seconds | Calculated | 3 m ÷ 0.5 m/s = 6 s |
| Q-55 | sheet-pair cost that opens the heat-slide review | 0.40 $ per household per year | From the brief | Debbie's recorded trigger |
| Q-56 | worst-case kit cost with no heat flattening | 0.94 $ per household per year | Calculated | Sheet 0.18 × 2.2 = 0.40 each; pair 0.80; 0.10 + 0.80 + 0.04 = 0.94 |
| Q-57 | agreement of weight loss and chemical analysis | within 10 % | From the brief | Requirement PACE-5 |
| Q-58 | mark check window against landing tests | months 9 to 12, carried on to real failure months | From the brief | Debbie's witness-mark decision and MARK-1 |
| Q-59 | liner gate test | liner pulled 0%, 50%, 90% and 100%; 100 of 100 incomplete fits show liner colour and stay unlocked fits | From the brief | Requirements MARK-3 and SHELL-3 |
| Q-60 | transfluthrin melting point | about 32 °C | From the brief | Design basis note |
| Q-61 | selling price, one household-year of protection | 0.90 $ per household-year, ex-factory | Assumed | Assumption under the Q-8 ceiling, billed per household-year on a 5-year supply contract |
| Q-62 | production loss and quality checks | 0.10 $ per household-year | Estimated | Judgment, answers the panel's point that Q-9 left these out |
| Q-63 | maker contribution per household-year | 0.30 $ per household-year | Calculated | Q-61 − Q-9 − Q-62 = 0.90 − 0.50 − 0.10 = 0.30 |
| Q-64 | Reachable market | 6 million household-years per year | Estimated | Judgment: 3 early-adopting national programmes × 2 million households each = 6 million |
| Q-65 | base-case sales | 2 million household-years per year | Estimated | Judgment: one national programme at 2 million households |
| Q-66 | downside sales | 0.5 million household-years per year | Estimated | Judgment: one pilot district programme |
| Q-67 | base revenue | 1.8 million $ per year | Calculated | 2 million × 0.90 = 1.8 million |
| Q-68 | downside revenue | 0.45 million $ per year | Calculated | 0.5 million × 0.90 = 0.45 million |
| Q-69 | upside revenue | 5.4 million $ per year | Calculated | 6 million × 0.90 = 5.4 million |
| Q-70 | development and qualification spend | 1.51 million $ | Calculated | Plan phases 60,000 + 50,000 + 400,000 + 600,000 + 400,000 = 1,510,000; each phase cost is an estimate |
| Q-71 | household spend on coils | 7 to 18 $ per household per year | Estimated | 2 to 5 cents a night × 365 nights |
| Q-72 | Guardian service life | up to 12 months | Published | WHO news item, 13 Aug 2025 |
| Q-73 | Mosquito Shield design life | 28 days | Published | Johns Hopkins Center for Communication Programs article, 30 Oct 2023 |
| Q-74 | malaria burden 2024 | 282 million cases and 610,000 deaths, 95% in the WHO African Region cases, deaths, % | Published | WHO malaria fact sheet |
| Q-75 | veranda grade airstream test point | 0.5 m/s (metres per second), against still air | From the brief | Requirement PACE-4 |
| Q-76 | pole strap width | about 8 mm mm | From the brief | Design basis |
| Q-77 | The indoor product is 200 mm across. | 200 mm | Calculated | The package states it: The indoor product is 200 mm across. |
Sizes the drawings are built from
| Part | Size | mm | Basis |
|---|---|---|---|
| Whole product | overall length (side to side across the wall or pole) | 200 | |
| Whole product | overall width (from the wall outwards, measured at the hood) | 28 | |
| Whole product | overall height (bottom to top of the frame. The grade tab stands 6 mm above the top, to 156 mm.) | 150 | |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | width | 200 ±0.5 mm | A requirement S4. Design form |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | height | 150 ±0.5 mm | A requirement S5. Design form |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | wall thickness | 2 ±0.1 mm | A standard S6. Moulding rule of 1.5 to 3 mm walls for polypropylene |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Locking seat the sheet bottom rests on: seat height above frame bottom edge F14 | 10 ±0.2 mm | Engineering judgement (provisional) S7. Sets where the sheet stops; held to ±0.2 mm so the dye stays inside the window; confirm on prototype |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Rail channels, left and right (their centre plane is datum C): gap between left and right channel bottoms | 178 ±0.3 mm | A calculation S8. 176 mm sheet plus 1 mm room each side |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Rail channels, left and right (their centre plane is datum C): channel width | 1.2 +0.2/-0 mm | A calculation S9. 0.55 mm thickest sheet edge plus at least 0.65 mm room |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Rail lips in front of the sheet edges: gap between rail lips | 172 ±0.5 mm | A calculation S10 = S8 - 2*S11. Lips overlap each sheet edge by 2 mm so the sheet cannot fall forward |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Rail channels, left and right (their centre plane is datum C): channel depth, channel bottom to lip edge | 3 ±0.1 mm | Engineering judgement (provisional) S11. 1 mm sheet room plus 2 mm overlap |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | key rib width, both ribs | 3 ±0.1 mm | A calculation S12. Fits the 3.4 mm notch with 0.2 mm least room and 0.3 mm most side play |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | key rib height above seat, both ribs | 4 ±0.2 mm | A calculation S13. Holds a wrong-grade sheet above the detent bump |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Indoor key rib: indoor rib centre left of the rail channel centre plane (datum C) | 49 ±0.2 mm | Engineering judgement (provisional) S14. Same place as 40 mm from the left channel bottom; far from the veranda rib so the grades cannot be confused |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Veranda key rib: veranda rib centre right of the rail channel centre plane (datum C) | 47 ±0.2 mm | Engineering judgement (provisional) S15. Same place as 136 mm from the left channel bottom; 96 mm from the indoor rib |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Fixing holes, two: fixing hole diameter | 4.5 +0.2/-0 mm | A calculation S16. 4 mm screw plus 0.5 mm room |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Fixing holes, two: fixing hole spacing | 120 ±0.5 mm | Engineering judgement (provisional) S17. Holes hidden behind the sheet |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Strap slots, two: strap slot length | 10 ±0.3 mm | A calculation S18. 8 mm strap plus 2 mm room |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Strap slots, two: strap slot width | 2.5 ±0.2 mm | A calculation S19. 1.4 mm strap plus room |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | clear depth from back plate inner face to sheet rear face | 5 ±0.15 mm | A calculation S20. Screw head 3.1 mm, or nail head plus washer 2.9 mm, must fit behind the sheet; held to ±0.15 mm so the depth stack closes |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Detent bumps in both channels just above the seat: detent bump height into channel | 1.05 ±0.05 mm | A calculation S21. Leaves a gap smaller than the thinnest sheet so the sheet clicks past |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Detent bumps in both channels just above the seat: bump top above seat | 1.5 ±0.2 mm | A calculation S22. Below the 2.7 mm lowest foot height and the 3.8 mm lowest rib height |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | Detent bumps in both channels just above the seat: channel gap left at the bump | 0.15 +0.25/-0.05 mm | A calculation S23 = S9 - S21. 0.10 to 0.40 mm, always under the 0.45 mm thinnest sheet |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | indoor frame centre height above floor | 1100 ±50 mm | A requirement S24. Seated head height |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs | veranda frame centre height above floor | 1500 ±50 mm | A requirement S25. About standing eye height |
| Frame front with grille, hood and window opening | depth at top under the hood | 28 ±0.5 mm | A requirement S26. Wedge form from the design |
| Frame front with grille, hood and window opening | wall thickness at grille | 2 ±0.1 mm | A standard S27. Moulding rule for polypropylene |
| Frame front with grille, hood and window opening | depth at bottom | 14.5 ±0.6 mm | A calculation S28 = S6 + S20 + S70 + S32 + S27. Stack of back wall, fixing room, sheet, set-back and grille wall: 0.1 + 0.15 + 0.05 + 0.2 + 0.1 = 0.6 mm worst case |
| Frame front with grille, hood and window opening | face corner radius | 8 ±0.5 mm | A requirement S29. Design form |
| Frame front with grille, hood and window opening | outer edge radius | 2 ±0.3 mm | A requirement S30. Design form |
| Frame front with grille, hood and window opening | Grille slots, 27 rows: grille slot width | 2.5 ±0.1 mm | A calculation S31. Widest slot 2.6 mm stops the 3 mm probe |
| Frame front with grille, hood and window opening | set-back from grille inner face to sheet face | 5 ±0.2 mm | A requirement S32. Finger guard and steady airflow; held to ±0.2 mm so the depth stack closes |
| Frame front with grille, hood and window opening | Grille slots, 27 rows: grille slot pitch, not cumulative | 4.5 ±0.02 mm | A calculation S33. 2.5 mm slot plus 2 mm bar |
| Frame front with grille, hood and window opening | Grille slots, 27 rows: grille bar width | 2 ±0.12 mm | A calculation S34 = S33 - S31. Pitch minus slot |
| Frame front with grille, hood and window opening | grille field width | 146 ±0.5 mm | A calculation S35. Ends 4 mm short of the window bore |
| Frame front with grille, hood and window opening | grille stiffening rib width, two ribs | 2 ±0.1 mm | Engineering judgement (provisional) S36. Stops long bars from sagging |
| Frame front with grille, hood and window opening | Grille slots, 27 rows: clear slot length | 142 ±0.7 mm | A calculation S37 = S35 - 2*S36. Field width minus two ribs |
| Frame front with grille, hood and window opening | grille field height | 119.5 ±0.8 mm | A calculation S38 = 27*S33 - S34. 27 slots and 26 bars |
| Frame front with grille, hood and window opening | grille field left edge from front left outer edge | 16 ±0.5 mm | Engineering judgement (provisional) S39. Keeps the grille inside the rails |
| Frame front with grille, hood and window opening | Top slot under the hood: top slot gap | 2 ±0.2 mm | A calculation S40. 0.575 mm sheet with liner plus pull room; shuts out the 3 mm probe |
| Frame front with grille, hood and window opening | Window ledge with clear viewing hole: clear viewing hole diameter | 18.4 ±0.1 mm | A calculation S41. Shows the whole dye square and grey bar at worst-case offsets |
| Frame front with grille, hood and window opening | Window bore for the lens: window bore diameter | 19.7 +0.1/-0 mm | A calculation S42. Gives a 0.15 to 0.30 mm press fit on the lens |
| Frame front with grille, hood and window opening | Window bore for the lens: window centre right of the front centre plane (datum B, centre of the four clip | 76 ±0.2 mm | A calculation S43. Same place as 24 mm from the right edge of the 200 mm front; keeps dye and bar inside the liner cover and clear of the grille |
| Frame front with grille, hood and window opening | Window bore for the lens: window centre from front bottom outer edge | 22 ±0.2 mm | A requirement S44. Lower right, below the hood shadow |
| Frame front with grille, hood and window opening | Snap clip hooks, four (their pattern centre is datum B): clip hook engagement | 1 ±0.1 mm | Engineering judgement (provisional) S45. Holds the halves for 5 years in polypropylene |
| Window lens | lens diameter | 20 +0/-0.05 mm | A requirement S46. 20 mm window lens |
| Window lens | lens thickness | 1.5 ±0.1 mm | Engineering judgement (provisional) S47. Stiff enough to press in |
| Wood screw for plugs | thread outside diameter | 4 +0/-0.3 mm | A standard S48. DIN 7505, size 4 |
| Wood screw for plugs | length | 40 ±0.8 mm | A standard S49. DIN 7505, 4 x 40 |
| Wood screw for plugs | head diameter | 8 +0/-0.6 mm | A standard S50. DIN 7505 form B, size 4; confirm on maker's sheet |
| Wood screw for plugs | head height | 3.1 +0/-0.3 mm | A standard S51. DIN 7505 form B, size 4; confirm on maker's sheet |
| Wall plug | outside diameter | 6 ±0.1 mm | A standard S52. fischer SX 6 x 30 |
| Wall plug | length | 30 ±0.5 mm | A standard S53. fischer SX 6 x 30 |
| Masonry nail | shank diameter | 3.5 ±0.1 mm | Engineering judgement (provisional) S54. Stiff enough to drive into firm mud |
| Masonry nail | length | 75 ±1 mm | Engineering judgement (provisional) S55. About 69 mm left in the wall after frame, spreader and washer |
| Masonry nail | head diameter | 8 ±0.3 mm | Engineering judgement (provisional) S56. Bears fully on the 12 mm washer |
| Masonry nail | head height | 1.5 ±0.2 mm | Engineering judgement (provisional) S57. Fits behind the sheet with the washer |
| Large backing washer | bore diameter | 4.3 +0.18/-0 mm | A standard S58. ISO 7093-1, size 4 |
| Large backing washer | outside diameter | 12 +0/-0.43 mm | A standard S59. ISO 7093-1, size 4 |
| Large backing washer | thickness | 1 ±0.2 mm | A standard S60. ISO 7093-1, size 4 |
| Releasable pole strap | width | 8 ±0.5 mm | Engineering judgement (provisional) S61. Heavy tie size |
| Releasable pole strap | length | 300 ±5 mm | A calculation S62. Wraps an 85 mm pole (267 mm round) with room for the catch |
| Releasable pole strap | thickness | 1.4 ±0.1 mm | Engineering judgement (provisional) S63. Heavy tie size |
| Spreader plate for crumbling mud (only in kits for weak walls) | length | 250 ±1 mm | Engineering judgement (provisional) S64. Spreads the load wider than the frame |
| Spreader plate for crumbling mud (only in kits for weak walls) | height | 60 ±1 mm | Engineering judgement (provisional) S65. Confirm in pull tests |
| Spreader plate for crumbling mud (only in kits for weak walls) | thickness | 2.5 ±0.2 mm | Engineering judgement (provisional) S66. Confirm in pull tests |
| Spreader plate for crumbling mud (only in kits for weak walls) | Inner nail holes, two, matching the frame: inner nail hole spacing | 120 ±0.5 mm | A calculation S67 = S17. Matches the frame holes |
| Spreader plate for crumbling mud (only in kits for weak walls) | Outer nail holes, two: outer nail hole spacing | 230 ±0.5 mm | Engineering judgement (provisional) S68. Spreads the load |
| Spreader plate for crumbling mud (only in kits for weak walls) | nail hole diameter, all four | 4 +0.2/-0 mm | A calculation S69. 3.5 mm nail plus room |
| EVA store film blank | laminate thickness, store plus pore film, liner removed | 0.5 ±0.05 mm | A calculation S70 = S78 + S79. Store film plus pore film |
| EVA store film blank | sheet width | 176 ±0.5 mm | A calculation S71. 178 mm channel gap minus 2 mm room |
| EVA store film blank | sheet body height | 128 ±0.5 mm | A calculation S72. Seat at 10 mm to top edge at 138 mm |
| EVA store film blank | Grade notch with lead-in chamfers: grade notch width | 3.4 ±0.1 mm | A calculation S73. Locates the seated sheet so the dye lines up with the window |
| EVA store film blank | Grade notch with lead-in chamfers: grade notch depth | 5 ±0.2 mm | A calculation S74. Deeper than the 4.2 mm tallest rib so the right sheet reaches the seat |
| EVA store film blank | Grade notch with lead-in chamfers: notch lead-in chamfer, each side, 45 degrees | 2 ±0.2 mm | A calculation S75. Catches the rib at the worst 1.8 mm side offset |
| EVA store film blank | Grade notch with lead-in chamfers: indoor notch centre left of the sheet centre plane (datum B, from side edges F44 | 49 ±0.2 mm | A calculation S76 = S14. Lines up with the indoor rib |
| EVA store film blank | Grade notch with lead-in chamfers: veranda notch centre right of the sheet centre plane (datum B, from side edges F | 47 ±0.2 mm | A calculation S77 = S15. Lines up with the veranda rib |
| EVA store film blank | store film thickness | 0.45 ±0.04 mm | Engineering judgement (provisional) S78. Holds a year's load; confirm in STORE-1 |
| Rate-control film | pore film thickness | 0.05 ±0.01 mm | Engineering judgement (provisional) S79. Typical stretched filled film; confirm in PACE-1 screen |
| EVA store film blank | Grade colour tab: grade tab width | 30 ±0.5 mm | Engineering judgement (provisional) S80. Easy grip, colour easy to see |
| EVA store film blank | Grade colour tab: grade tab length above sheet body | 18 ±1 mm | A calculation S81. Puts the tab top 6 mm above the frame top |
| EVA store film blank | Grade colour tab: tab showing above frame top | 6 ±2.2 mm | A calculation S82 = S7 + S72 + S81 - S5. Short coloured tab shows above the brow: 0.2 + 0.5 + 1 + 0.5 = 2.2 mm worst case |
| Witness dye, reference bar ink and hidden symbol ink | Dye square: dye square side | 8 ±0.1 mm | A calculation S83. Dye, gap and bar fit in the viewing hole at worst offsets |
| Witness dye, reference bar ink and hidden symbol ink | Grey reference bar: grey bar width | 3 ±0.1 mm | A calculation S84. Fits beside the dye square |
| Witness dye, reference bar ink and hidden symbol ink | Grey reference bar: grey bar height | 8 ±0.1 mm | A calculation S85. Same height as the dye square |
| Witness dye, reference bar ink and hidden symbol ink | gap between dye square and grey bar | 1 ±0.1 mm | Engineering judgement (provisional) S86. Clear edge between the two |
| Witness dye, reference bar ink and hidden symbol ink | Hidden crossed-out mosquito symbol: symbol size | 6 ±0.3 mm | Engineering judgement (provisional) S87. Sits inside the dye square |
| Witness dye, reference bar ink and hidden symbol ink | width of dye, gap and bar together | 12 ±0.3 mm | A calculation S88 = S83 + S86 + S84. Used in the window fit check |
| Witness dye, reference bar ink and hidden symbol ink | centre of dye and bar right of the sheet centre plane (P10 datum B), print regis | 76 ±0.2 mm | A calculation S89 = S43. Under the window centre when seated |
| Witness dye, reference bar ink and hidden symbol ink | centre of dye and bar above sheet bottom edge, print registration | 12 ±0.4 mm | A calculation S90 = S44 - S7. Under the window centre when seated |
| Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting | liner thickness | 0.075 ±0.01 mm | Engineering judgement (provisional) S91. Stock release film |
| Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting | liner width | 168 ±0.5 mm | A calculation S92. Inside the 172 mm lip gap; still covers the dye and bar |
| Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting | Spacer foot: foot height | 3 ±0.3 mm | A requirement S93. Holds the sheet above the detent until the liner is out |
| Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting | Pull tab: pull travel, covering the face to fully out | 150 ±5 mm | A calculation S94. 128 mm body plus foot and tab |
| EVA store film blank | total sheet thickness with liner | 0.575 ±0.06 mm | A calculation S95 = S70 + S91. Passes the 1.8 mm narrowest top slot |
| Foil pouch | pouch inside width | 186 ±2 mm | Engineering judgement (provisional) S96. Sheet plus room |
| Foil pouch | pouch inside length | 200 ±2 mm | Engineering judgement (provisional) S97. Sheet, tab and liner tab plus room |
| Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting | packed length, foot bottom to pull-tab tip, laid flat | 181 ±1 mm | Engineering judgement (provisional) S98. 3 mm foot plus 128 mm sheet body plus a 50 mm pull tab above the body, long enough to grab above the frame top |
| Transfluthrin, one sheet's load | loaded zone width | 164 ±1 mm | Engineering judgement (provisional) S99. Leaves a 6 mm unloaded border each side for the edge seal and stays under the 168 mm liner; confirm in STORE-2 |
| Transfluthrin, one sheet's load | loaded zone height | 120 ±1 mm | Engineering judgement (provisional) S100. Leaves a 4 mm unloaded border top and bottom for the edge seal; confirm in STORE-2 |
| Frame front with grille, hood and window opening | height of the grille field's bottom edge above the front's bottom edge | 12 ±0.5 mm | A calculation S101. The seated sheet starts at 10 mm, the locking seat height. The grille starts 2 mm higher, so every slot faces the sheet. The window spans 12 to 32 mm high at 76 mm right of centre, and the field's right edge is at 62 mm, so the window stays outside the field (MARK-2). |
| Frame front with grille, hood and window opening | height of the grille field's top edge above the front's bottom edge | 131.5 ±0.5 mm | A calculation S102. 12 mm + 119.5 mm field height = 131.5 mm. This is below the seated sheet top at 138 mm (10 + 128). |
| Frame front with grille, hood and window opening | height where the flat face starts to swell into the hood | 132 ±0.5 mm | A calculation S103. 0.5 mm above the grille top at 131.5 mm, so no slot is cut into the curve. Up to here the depth stays 14.5 mm, which keeps the 5 mm set-back (SHELL-1). |
| Frame front with grille, hood and window opening | height where the hood reaches its full 28 mm depth | 142 ±0.5 mm | Engineering judgement (provisional) S104. A 10 mm swell from 132 mm leaves 8 mm of full-depth hood over the 2 mm top slot and the sheet top at 138 mm. To confirm with the prototype. |
| EVA store film blank | sheet bottom edge height above frame bottom edge, start (liner on, held up by th | 13 ±0.3 mm | A calculation S105. 10 mm seat + 3 mm foot hold-up (SHELL-3). |
| EVA store film blank | sheet bottom edge height above frame bottom edge, end (seated and locked) | 10 ±0.2 mm | A calculation S106. Rests on the 10 mm seat once the liner is fully out. The dye centre then sits at 10 + 12 = 22 mm, matching the window centre (MARK-2). |
| Window lens | lens front face depth behind the front's outer face | 0.5 ±0.1 mm | A calculation S107. 2 mm front wall − 1.5 mm lens thickness = 0.5 mm. The lens back face sits flush with the wall's inner face, and the 0.5 mm viewing ledge holds it in. The gap to the sheet face stays 5 mm (MARK-2). |
| Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector | height of the rail channel bottom end above the frame bottom edge | 8.9 ±0.2 mm | A calculation The channels start at the seat's underside: 10 mm seat height − 1.1 mm seat thickness = 8.9 mm. |
| Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector | height of the rail tops above the frame bottom edge | 148 ±0.3 mm | A calculation 150 mm frame height − 2 mm top wall = 148 mm. This clears the seated sheet top at 138 mm. |
| Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector | rail channel length | 139.1 ±0.4 mm | A calculation 148 mm − 8.9 mm = 139.1 mm. |
| Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector | locking seat depth out from the back plate inner face | 6.5 ±0.2 mm | A calculation The sheet rear face sits 5 mm out. With liner, the sheet front face sits 5.575 mm out. A 6.5 mm seat supports the full sheet and foot with about 0.9 mm to spare, and stays 6 mm clear of the grille inner face at 12.5 mm. To confirm with the prototype. |
| Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector | locking seat length between the rail ribs | 172 ±0.5 mm | A calculation Equal to the 172 mm gap between the rail lips, so the seat runs the full width between the ribs. |
| Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector | height of both fixing hole centres above the frame bottom edge | 75 ±0.5 mm | A calculation Half of the 150 mm frame height. The holes sit 60 mm either side of centre (120 mm spacing). The screw head (3.1 mm) and the washer plus nail head (2.5 mm) fit inside the 5 mm clear depth behind the sheet (FIX-1). |
| Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector | selector travel from start to the indoor lock (leftward) | 49 ±0.2 mm | A requirement PACE-4. Indoor notch centre 49 mm left of datum C. |
| Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector | selector travel from start to the veranda lock (rightward) | 47 ±0.2 mm | A requirement PACE-4. Veranda notch centre 47 mm right of datum C. |
| Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line | pull tab width, centred on the sheet | 30 ±0.5 mm | Engineering judgement (provisional) Matches the 30 mm grade tab, so both pass the top slot together. The liner tab lies in front of the grade tab. To confirm with the prototype. |
| Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line | pull tab length beyond the sheet top | 50 ±1 mm | A calculation 181 mm packed length − 3 mm foot − 128 mm sheet face = 50 mm. |
| Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line | folded foot thickness, front to back | 0.575 ±0.06 mm | A calculation Equal to the total sheet thickness with liner, so the foot lies square under the sheet's bottom edge. The foot is split around the grade notch so it never rests on the selector key (SHELL-3). |
| Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line | folded foot rear face distance off the wall (datum A) | 7 ±0.15 mm | A calculation 2 mm back plate + 5 mm clear depth to the sheet rear face. The foot runs from 7.0 to 7.575 mm off the wall, inside the 8.5 mm seat front edge. |
| Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line | pull travel, from covering the face to fully out | 150 ±5 mm | A requirement SHELL-3 and SWAP-1. The tab starts 50 mm above the sheet top and ends with the foot clear of the slot. |
| Indoor room (setting) | air volume, in litres | 30000 | From Inventor's design target of 30 cubic metres; value given in litres |
| Veranda (setting) | floor area, in square centimetres | 100000 | From Inventor's design target of 10 square metres; value given in square centimetres |
| Cooking fire (setting) | minimum distance from indoor frame | 1000 | From Fitting rule in the requirements |
| Veranda roof pole (setting) | diameter | 75 | From Judgment, range 50 to 85 mm; to confirm on site visits |
| Block or mud wall (setting) | minimum drilled hole depth in block, 40 mm, so the hole clears the screw tip; the required screw wall-entry depth in block is at least 35 mm (a judgment), which the 4 x 40 screw reaches through the back plate | 40 | From The 4 x 40 screw passes through the 2 mm back plate, so its tip reaches 38 mm into the wall and the 6 x 30 plug is seated 30 mm deep; the drilled hole must be at least 40 mm deep to clear the screw tip. Firm mud uses the 75 mm nail, about 69 mm embedded through frame, spreader and washer. Required wall-entry depth is set apart from fastener length. In block it is at least 35 mm (a judgment). The 4 x 40 screw still reaches 37.1 mm at its shortest allowed length of 39.2 mm, through the thickest allowed back plate of 2.1 mm, and passes the full 30 mm plug. In firm mud it is at least 60 mm (a judgment). The 75 mm nail reaches about 68 mm in the worst case, through frame, spreader and washer. Both depths are confirmed in the FIX-1 50 N pull test on each wall type |
| Air temperature (setting) | working range top, in °C | 35 | From Inventor's design target, range 25 to 35 °C |
| Jointed test finger used in the finger-guard check (setting) | probe diameter | 12 | From IEC 61032 test probe B |
| Jointed test finger used in the finger-guard check (setting) | probe length | 80 | From IEC 61032 test probe B |
Worked calculations
The hard part worked with numbers. Each is a calculation or simulation, not a test result.
| What | Inputs and working | Result | Meets the target |
|---|---|---|---|
| How much faster a bare transfluthrin store gives off vapour at 35 °C than at 25 °C, and how gently the slowest step in the sheet must respond to heat to reach the 1.5 target. | Temperatures of 25 °C and 35 °C, which are 298.15 and 308.15 kelvin. Kelvin is a temperature scale that starts at absolute zero; you add 273.15 to the °C value. The heat needed to turn the chemical into vapour is called the enthalpy of vaporisation. Its value here is 80 to 100 kJ/mol. That unit means kilojoules of energy for a fixed count of molecules. This range is an estimate typical of slow-evaporating pyrethroid insecticides, the chemical family transfluthrin belongs to. It comes from your note. No measured value for transfluthrin is in the record. The gas constant is 8.314 J/mol/K, a fixed physics number. The target comes from PACE-1: a hot-to-cool ratio of 1.5 as the value of record, passing at 1.6 or below. The Clausius-Clapeyron rule says how steeply a substance's vapour push rises with heat: ratio = e^[(H ÷ 8.314) × (1/298.15 − 1/308.15)]. The bracket is 10 ÷ (298.15 × 308.15) = 0.0001088 per kelvin. At 80 kJ/mol: 80,000 ÷ 8.314 = 9,622; 9,622 × 0.0001088 = 1.047; e^1.047 = 2.85. At 100 kJ/mol: 12,028 × 0.0001088 = 1.309; e^1.309 = 3.70. Run the rule backwards to find the heat sensitivity the slowest step may have. For a ratio of 1.5: ln 1.5 = 0.405; 0.405 ÷ 0.0001088 × 8.314 = about 31,000 J/mol, which is 31 kJ/mol. For 1.6: ln 1.6 = 0.470, which gives about 36 kJ/mol. | A bare store speeds up about 2.9 to 3.7 times from 25 to 35 °C. To reach 1.5, the slowest step in the sheet must respond to heat about one third as strongly as evaporation does. In technical terms, it needs an apparent activation energy of about 31 kJ/mol, and no more than about 36 kJ/mol for the 1.6 pass. Activation energy is a measure of how strongly a process speeds up with heat. This brings a warning for the sheet maker. Suppose the front film's tiny pores are filled with air and the store behind them stays full. Then the vapour in the pores still follows the store's vapour push. The pores cut the amount released, but the 2.9 to 3.7 times rise stays almost whole. The flattening must come from a step that may respond less to heat, such as the chemical creeping through solid plastic. Whether any stock film does this is unknown. Only the measured framed ratio can show it. | No PACE-1: framed hot-to-cool ratio target 1.5, passing at 1.6 or below; the bare store control must reach at least 2.5. |
| How much chemical each sheet must carry, counted in months of minimum useful release, for the test of 12 months at 35 °C plus one spare month. | U is the useful release per month the sheet needs at its coolest working temperature, 25 °C. Its value of record is still to be set under PACE-5, because the record holds no effective air level for transfluthrin. The hot-to-cool ratio is 1.5 at the target, or about 3.3 for a sheet with no flattening, the middle of the first calculation. The test runs 12 months at 35 °C plus one spare month (STORE-1). The spare month is a judgment, to be fixed by test. The sheet must still give U when the room is cool. So at 35 °C it gives the ratio times U each month, for 13 months. At 1.5: 13 × 1.5 × U = 19.5 U. At 3.3: 13 × 3.3 × U = 42.9 U. That is 42.9 ÷ 19.5 = 2.2 times as much chemical. Now take a cool home where the sheet runs near 25 °C for 12 months and so uses 12 U. The leftover at 1.5 is 7.5 U, which is 7.5 ÷ 19.5 = 38% of the load. The leftover with no flattening is 30.9 U, which is 30.9 ÷ 42.9 = 72%. | At the 1.5 target, each sheet carries about 19.5 months of minimum release. With no heat flattening, it would need about 2.2 times as much chemical. In cool homes, the yearly swap leaves about 38% of the load unused at 1.5, against about 72% with no flattening. That leftover goes back in spent sheets through the hand-out channel. Chemical stuck in the film that can never leave is extra. It must be measured and added under STORE-1. The real load in grams cannot be set until the effective air level, U, and the framed ratio are measured. | No STORE-1: load set from measured framed release at 35 °C over 12 months plus one spare month; release at 35 °C within 10% of its month-1 value through month 11. |
| Cost per household per year for the whole kit, and how close it sits to the cost trigger Debbie set for the heat-slide upgrade. | These are all estimates from the working budget in MAKE-1, with no supplier quote. Frame: $0.25 each, two per household. Frame life: 5 years, the value of record. Sheet: $0.18 each, the value of record, two per household per year. Packaging: $0.04 per household per year. Debbie's recorded trigger: the heat-slide upgrade is reviewed if the framed ratio is above 1.6, or if the hot-month load pushes the sheet pair above $0.40. The 2.2 times load factor comes from the second calculation. Frames: 2 × $0.25 ÷ 5 years = $0.10. Sheets: 2 × $0.18 = $0.36. Packaging: $0.04. Total: $0.10 + $0.36 + $0.04 = $0.50 per household per year. Room under the ceiling: $1.00 − $0.50 = $0.50. The sheet pair crosses Debbie's $0.40 trigger if each sheet rises by $0.02, about 11%. Now take a worst case. Assume the chemical were the whole sheet cost and the load had to rise 2.2 times because the film gives no flattening. Each sheet would then cost $0.18 × 2.2 = $0.40. The pair would cost $0.80. The kit would cost $0.10 + $0.80 + $0.04 = $0.94. | The estimated kit cost is $0.50 per household per year, ex-factory, meaning the price at the factory gate. That is half the $1 ceiling. The sheet pair, at $0.36, sits just $0.04 under Debbie's $0.40 trigger. A sheet with no heat flattening would still come in under $1, at $0.94. But it would leave only $0.06 of room and would open the heat-slide review. Delivery, fitting, collection and disposal are left out and must be reported separately. | Yes MAKE-1 and MAKE-3: complete kit under $1 per household per year ex-factory, with $0.50 as a sub-budget estimate inside it. |
| How much more the breeze thins the vapour on the veranda than air change does in the closed room, if the air in each space mixed evenly. | Room volume: 30 m3, from the brief. Room fresh air: 1 to 5 room-fulls per hour. This is a judgment; no measured value is in the record. Veranda: 10 m2 of floor, from the brief. The breeze enters through an open side 3 m wide and 2.5 m tall, or 7.5 m2. Those sizes are a judgment. Breeze speed: 0.5 m/s, the figure used in the brainstorm, down to 0.1 m/s for near-still air, which is a judgment. Room fresh air: 30 × 1 = 30 m3 per hour, up to 30 × 5 = 150 m3 per hour. Veranda at 0.5 m/s: 7.5 m2 × 0.5 = 3.75 m3 per second, which is 13,500 m3 per hour. At 0.1 m/s: 2,700 m3 per hour. For the same evenly mixed air level, release must grow with fresh-air flow. The smallest gap is 2,700 ÷ 150 = 18 times. The largest is 13,500 ÷ 30 = 450 times. | If the veranda air mixed evenly, the veranda sheet would need about 18 to 450 times the indoor release. Extra pore area in a 200 mm by 150 mm frame cannot close a gap that large. The veranda unit can only work by sitting on the breeze side. There its vapour crosses the seats as a narrow stream before it spreads. At 0.5 m/s, the stream takes about 6 seconds to cross a 3 m veranda, so it has little time to spread out. No desk calculation can size that stream. The wind limit has to come from the landing test. If the shared frame fails that test, Debbie's recorded fallback is the roof-edge strip (design 3). The same gap shows a safety point. Indoors, a veranda sheet would give tens to hundreds of times the needed release. The grade key (PACE-4) and the breathing check (PACE-2) exist to stop that. | No PACE-3 and PACE-4: at least 70% fewer landings than untreated control on the roofed, side-sheltered 10 m2 veranda at the labelled wind limit, within the usable opening of the 200 mm x 150 mm frame. |
No bench test was run, no sheet was made and no buyer was asked. The record holds no effective air level for transfluthrin, no measured release rate, no safe breathing limit, no room air-change rate and no veranda wind data. So every figure above is a ratio or a method, and none is a load in grams. The heat calculation uses an estimated enthalpy of vaporisation (80 to 100 kJ/mol). Transfluthrin melts at about 32 °C, inside the working range, so release may jump at that point; only testing will show it. The veranda calculation treats air as evenly mixed, while the design depends on a breeze-side stream that only testing can measure. No air figure can predict the 70% landing cut. The landing test decides it. All costs are estimates from the working budget, with no supplier quote. Guardian's price is not public, so any claim that this kit costs less than Guardian is an estimate. The main way this design can fail is under-release in heat or wind while the dye square still looks fresh. The safety gate is month-12 landing tests plus paired dye-square ageing. Before any occupied-home trial, both should run at a test facility recognised for WHO prequalification and working to GLP. GLP, good laboratory practice, is a quality system for test labs. One example is Ifakara Health Institute, a Tanzanian research institute that the digest names as a test site. An inhalation exposure assessment of a fresh sheet at 35 °C in a closed room must run alongside them.
Product record
The record every other section cites: each part, size and connection written once.
Acceptance: how each requirement is passed
| Requirement | What is measured | Pass mark | What it means |
|---|---|---|---|
| STORE-1 | Monthly framed release at 35 °C, months 1 to 11, difference from the month-1 release, by chemical analysis | at most 10 % | Pass means every monthly release at 35 °C from month 1 to month 11 is no more than 10% above or below the month-1 value, for each grade. |
| STORE-1 | Load per sheet as a share of the measured 13-month demand at 35 °C | at least 100 % | Demand means framed useful release over 12 months plus one spare month, plus chemical left unusable at the end, plus leaked and broken-down chemical, all measured on framed sheets. Pass means the load is at least that total for each grade. |
| STORE-2 | Transfluthrin from edge wipes, corrected by the wipe method's measured recovery, on the worst single sheet | under 1 % of load | Pass means every one of 30 sealed and 30 opened sheets stays under 1% after 30 days at 40 °C, and again after 12 months at 35 °C. |
| STORE-2 | Sheets with visible liquid on face or edges at any weekly look | 0 sheets | Visible liquid means any wet shine, drop or run that an inspector with normal or corrected eyesight sees from 300 mm away, under at least 1000 lux (bright indoor light), looking at both faces and all four edges. A doubtful spot counts as liquid if clean white absorbent paper pressed on it for 5 seconds shows a mark. Pass means zero of the 30 sealed and 30 opened sheets show liquid at any weekly look, both in the 30-day test at 40 °C and in the 12-month test at 35 °C. |
| PACE-1 | Framed release at 35 °C divided by framed release at 25 °C, same age and airflow, each month for 12 months | at most 1.6 ratio | Target is 1.5. Pass means every monthly ratio is 1.6 or below and every month meets PACE-5. Any ratio above 1.6 fails and opens the heat-slide review. |
| PACE-1 | Bare store control release at 35 °C divided by release at 25 °C | at least 2.5 ratio | The run counts only if the bare control reaches at least 2.5. The month a bare control runs out or drops below the useful-release value is recorded. |
| PACE-2 | Highest measured or calculated exposure divided by the documented limit, for each covered group | under 1 ratio | Covered groups are sleeping adults, children at child breathing height, and indoor pets (dogs and cats) at their breathing height; each group's limit is written down before testing. Pass means every ratio is under 1 with both units running, at startup peak, with aged sheets at 35 °C, method and uncertainty recorded. No occupied-home trial starts before this passes. |
| PACE-3 | Drop in mosquito landings against the untreated control, at every required check from startup to month 12 | at least 70 % | Measured in the 30 cubic metre room and the roofed, side-sheltered 10 square metre veranda. Pass means both spaces reach at least 70% at every check; the lower result decides. The labelled wind limit is the highest sustained 5-minute-average wind range that passes on every repeat. |
| PACE-4 | Wrong-grade sheets that reach the locking seat after the selector rib is set key rib height above seat, both ribs 4 mm | 0 of 100 tries | Reach the seat means the sheet bottom drops below the detent bump top and clicks. Pass means no wrong-grade sheet does so in 100 tries for each frame setting, indoor and veranda. |
| PACE-4 | Veranda-grade release at the labelled wind limit, as a share of the release that passed PACE-3 | at least 100 % | Measured at 25 and 35 °C, in still air and in a 0.5 m/s airstream (metres per second), on a standard 200 by 150 mm frame. |
| MARK-1 | Monthly landing checks between the 'replace' signal and the first failing check | at least 1 checks | Replace signal means the dye square looks no darker than the grey bar and the crossed-out mosquito shows. Pass means it shows at or before the last passing check at 25, 30 and 35 °C, clean and sooted. |
| MARK-1 | Monthly landing checks between the 'replace' signal and the first failing check | at most 2 checks | Pass means the signal shows no more than 30 days before the last passing check, so sheets are not thrown away early. |
| MARK-1 | Correct readings without words | at least 90 of 100 readings | Correct means the reader says 'keep' or 'replace' and matches the paired landing result. |
| MARK-3 | Incomplete-liner fits where the window shows blue dye | 0 of 100 fits | Incomplete means liner pulled 0%, 50%, 90% or torn. Pass means every such fit shows white liner colour in the window, and only full removal shows blue. |
| FIX-3 | Indoor frame centre height above the floor indoor frame centre height above floor 1100 mm | at least 1050 mm | About 1.1 m means 1050 to 1150 mm, measured with a tape from the floor straight below to the frame centre. Pass needs this line and the next one. |
| FIX-3 | Indoor frame centre height above the floor indoor frame centre height above floor 1100 mm | at most 1150 mm | Upper end of the 1050 to 1150 mm band for 'about 1.1 m'. |
| FIX-3 | Distance from indoor frame edge to the cooking fire edge | at least 1000 mm | Measured along the floor between the nearest edges. |
| FIX-3 | Veranda frame centre height above the floor, on the pole facing the evening breeze veranda frame centre height above floor 1500 mm | at least 1450 mm | About 1.5 m means 1450 to 1550 mm. Pass also needs the frame on the pole side the evening breeze comes in from, the window facing the seats, and the whole viewing hole seen from every seat. Pass needs this line and the next one. |
| FIX-3 | Veranda frame centre height above the floor, on the pole facing the evening breeze veranda frame centre height above floor 1500 mm | at most 1550 mm | Upper end of the 1450 to 1550 mm band for 'about 1.5 m'. |
| SHELL-2 | Grille open area as a share of the usable sheet face grille slot width 2.5 mm | at least 40 % | Usable sheet face means rail lip gap times sheet body height. |
| SHELL-2 | Release after the recorded soot load, difference from a clean sheet | at most 20 % | Soot mass, source, time, airflow, humidity and cleaning state are written down before testing. Pass also needs the dirty unit to pass PACE-3, PACE-5, MARK-1 and MARK-2. |
| SWAP-3 | Label or hand-out lines that say the device replaces bed nets or protects against dengue | 0 lines | Any wording that suggests either counts as a claim. |
| SWAP-3 | Users who say bed nets are still needed | at least 90 of 100 users | Counted in comprehension interviews. |
| SWAP-3 | Trial households still using nets, reported and seen | at least 90 of 100 households | Pass means at least 90 at every trial visit. |
What meets each requirement
| Requirement | Met by | How | Number against its limit |
|---|---|---|---|
| STORE-1 | EVA store film blank; Transfluthrin, one sheet's load; Rate-control film; store film thickness 0.45 mm | Test | Monthly weighing and chemical analysis at 25, 30 and 35 °C; not yet run |
| STORE-2 | EVA store film blank; Transfluthrin, one sheet's load; Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting; EVA store film blank: Sheet side edges that run in the channels (their centre plane is datum B); loaded zone width 164 mm; loaded zone height 120 mm | Test | Edge wipe tests at 40 °C and 35 °C; the unloaded seal border keeps chemical off the edges; not yet run |
| PACE-1 | Rate-control film; EVA store film blank | Test | Side-by-side framed and bare ageing; not yet run |
| PACE-2 | Rate-control film; Transfluthrin, one sheet's load; EVA store film blank | Test | Air sampling plus inhalation assessment at a WHO-recognised test site; not yet run |
| PACE-3 | Rate-control film; EVA store film blank; Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs; Frame front with grille, hood and window opening | Test | Semi-field landing tests; not yet run |
| PACE-4 | Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Indoor key rib; Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Veranda key rib; EVA store film blank: Grade notch with lead-in chamfers; key rib height above seat, both ribs 4 mm; grade notch depth 5 mm | Calculation | 3.8 mm against over 1.7 mm Wrong sheet rests on rib top: lowest rib 4.0 - 0.2 = 3.8 mm; highest bump top 1.5 + 0.2 = 1.7 mm; it never clicks. Right sheet: shallowest notch 4.8 mm > tallest rib 4.2 mm, so it reaches the seat |
| PACE-5 | Rate-control film; EVA store film blank | Test | Monthly release against each grade's value of record; not yet run |
| MARK-1 | Witness dye, reference bar ink and hidden symbol ink; Witness dye, reference bar ink and hidden symbol ink: Dye square; Rate-control film | Test | Paired dye and landing ageing; not yet run |
| MARK-2 | Frame front with grille, hood and window opening: Window ledge with clear viewing hole; clear viewing hole diameter 18.4 mm; dye square side 8 mm; grey bar width 3 mm; grey bar height 8 mm; width of dye, gap and bar together 12 mm; centre of dye and bar right of the sheet centre plane (P10 datum B), print regis 76 mm; centre of dye and bar above sheet bottom edge, print registration 12 mm; window centre right of the front centre plane (datum B, centre of the four clip 76 mm; window centre from front bottom outer edge 22 mm; seat height above frame bottom edge F14 10 mm | Calculation | 8.86 mm radius against at most 9.15 mm radius Side offset 0.3 notch play + 0.2 rib position + 0.2 notch position + 0.2 print + 0.2 window + 0.1 front fit = 1.2; up offset 0.2 seat + 0.4 print + 0.2 window + 0.1 front fit = 0.9; largest half-size 12.3 / 2 = 6.15 wide and 8.1 / 2 = 4.05 tall; far corner (7.35, 4.95) = 8.86 mm from centre; smallest hole radius 18.3 / 2 = 9.15 mm |
| MARK-3 | Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting; liner width 168 mm; centre of dye and bar right of the sheet centre plane (P10 datum B), print regis 76 mm; width of dye, gap and bar together 12 mm | Calculation | 82.35 mm from centreline against at most 83.25 mm from centreline Bar right edge 76 + 0.2 + 12.3 / 2 = 82.35 mm right of the sheet centre plane; liner right edge at worst 168 / 2 - 0.25 - 0.5 placement = 83.25 mm; liner covers dye and bar until removed |
| FIX-1 | Wood screw for plugs; Wall plug; Masonry nail; Large backing washer; Spreader plate for crumbling mud (only in kits for weak walls); clear depth from back plate inner face to sheet rear face 5 mm; head height 3.1 mm; head height 1.5 mm; thickness 1 mm | Calculation | 3.1 mm against at most 4.85 mm Tallest head stack behind the sheet: screw head 3.1 mm; nail head 1.7 + washer 1.2 = 2.9 mm; least clear depth 5.0 - 0.15 = 4.85 mm. Holding force of 50 N still needs the pull tests |
| FIX-2 | Wood screw for plugs; Wall plug; Masonry nail; Large backing washer; Releasable pole strap; Spreader plate for crumbling mud (only in kits for weak walls) | Test | Pull and 12-month tests per surface; untested surfaces marked 'do not fit' |
| FIX-3 | indoor frame centre height above floor 1100 mm; veranda frame centre height above floor 1500 mm; Frame front with grille, hood and window opening: Window bore for the lens | Inspection | 1150 mm against at most 1150 mm Indoor 1100 + 50 = 1150 mm highest and 1100 - 50 = 1050 mm lowest, both inside the 1050 to 1150 mm band; veranda 1450 to 1550 mm the same way; measured at fitting |
| SHELL-1 | grille slot width 2.5 mm; top slot gap 2 mm; set-back from grille inner face to sheet face 5 mm | Calculation | 2.6 mm against under 3 mm Widest slot 2.5 + 0.1 = 2.6 mm and widest top slot 2.2 mm are under the 3 mm probe; the 12 mm jointed test finger (IEC 61032 probe B, pushed at 10 N) cannot enter. Probe test still required |
| SHELL-2 | Frame front with grille, hood and window opening: Grille slots, 27 rows; grille slot width 2.5 mm; clear slot length 142 mm; gap between rail lips 172 mm; sheet body height 128 mm | Calculation | 9156 mm² against at least 8866 mm² Least open area 27 × 2.4 × 141.3 = 9156 mm²; 40% of largest usable face 0.40 × 172.5 × 128.5 = 8866 mm² |
| SHELL-3 | Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting: Spacer foot; Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Detent bumps in both channels just above the seat; foot height 3 mm; bump top above seat 1.5 mm | Calculation | 2.7 mm against over 1.7 mm Lowest foot 3.0 - 0.3 = 2.7 mm holds the sheet above the highest bump top 1.5 + 0.2 = 1.7 mm, so no click while the foot is under it |
| SHELL-4 | Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs; Frame front with grille, hood and window opening; Window lens; Releasable pole strap | Test | Accelerated sun and heat ageing, then FIX-1, MARK-2, clip and key tests; not yet run |
| SWAP-1 | Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting: Pull tab; pull travel, covering the face to fully out 150 mm; Frame front with grille, hood and window opening: Grille slots, 27 rows; I26 | Test | Timed swap trial with hand wipes; not yet run |
| SWAP-2 | Foil pouch | Test | Pouches stored at 35 °C for 2 years; not yet run |
| SWAP-3 | Foil pouch | Inspection | Label review and interviews; not yet run |
| SWAP-4 | Foil pouch | Inspection | Counted per district each year; 80% is a judgment |
| MAKE-1 | Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs; Frame front with grille, hood and window opening; EVA store film blank; Foil pouch | Calculation | 0.5 $/household-year against under 1 $/household-year Two $0.25 frames over 5 years = $0.10; two $0.18 sheets = $0.36; packaging $0.04; total $0.50 (all estimates, a judgment until quotes arrive) |
| MAKE-2 | EVA store film blank; Transfluthrin, one sheet's load; Rate-control film; Foil pouch | Test | Pilot lots at a patch or label converter; not yet run |
| MAKE-3 | EVA store film blank; Rate-control film | Inspection | Audit of every document and label before release |
How the parts connect
| Between | Kind | Why |
|---|---|---|
| EVA store film blank: Sheet side edges that run in the channels (their centre plane is datum B) Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Rail channels, left and right (their centre plane is datum C) | Clearance fit | Widest sheet 176.5 mm in narrowest gap 177.7 mm leaves at least 1.2 mm; most side play 2.8 mm |
| EVA store film blank: Sheet side edges that run in the channels (their centre plane is datum B) Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Rail channels, left and right (their centre plane is datum C) | Clearance fit | Thickest edge 0.55 mm in narrowest channel 1.2 mm leaves at least 0.65 mm |
| Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Indoor key rib EVA store film blank: Grade notch with lead-in chamfers | Clearance fit | Widest rib 3.1 mm in narrowest notch 3.3 mm leaves at least 0.2 mm; same fit for F8 |
| EVA store film blank: Sheet side edges that run in the channels (their centre plane is datum B) Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Detent bumps in both channels just above the seat | Interference fit | Sheet 0.45 to 0.55 mm against a 0.10 to 0.40 mm gap gives 0.05 to 0.45 mm squeeze, the click |
| Window lens: Lens rim (outside cylinder) Frame front with grille, hood and window opening: Window bore for the lens | Interference fit | Lens 19.95 to 20.00 mm in bore 19.70 to 19.80 mm gives 0.15 to 0.30 mm press fit, at most 1.5% stretch |
| Wood screw for plugs: Screw thread Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Fixing holes, two | Clearance fit | 4.0 mm screw in 4.5 mm smallest hole leaves 0.5 mm |
| Masonry nail: Nail shank Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Fixing holes, two | Clearance fit | 3.6 mm biggest nail in 4.5 mm hole leaves 0.9 mm |
| Masonry nail: Nail shank Large backing washer: Washer bore | Clearance fit | 3.6 mm nail in 4.3 mm washer bore leaves 0.7 mm |
| Masonry nail: Nail shank Spreader plate for crumbling mud (only in kits for weak walls): Inner nail holes, two, matching the frame | Clearance fit | 3.6 mm nail in 4.0 mm spreader hole leaves 0.4 mm |
| Releasable pole strap: Strap side edges Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Strap slots, two | Clearance fit | 8.5 mm widest strap in 9.7 mm shortest slot leaves 1.2 mm |
| Releasable pole strap: Strap band face Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Strap slots, two | Clearance fit | 1.5 mm thickest strap in 2.3 mm narrowest slot leaves 0.8 mm |
| Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting: Spacer foot Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Locking seat the sheet bottom rests on | Contact | Foot stands on the seat and holds the sheet up by S93 until the liner leaves |
| EVA store film blank: Sheet bottom edge Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Locking seat the sheet bottom rests on | Contact | Sheet bottom rests on the seat once the liner is out |
| Frame front with grille, hood and window opening: Rear rim face that sits on the back plate Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Rim face the front sits on | Contact | Front rim sits flat on the back plate rim |
| Frame front with grille, hood and window opening: Snap clip hooks, four (their pattern centre is datum B) Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Clip catches, four | Contact | Four hooks hold the front on with S45 engagement and set its side and up position |
| Window lens: Lens front face Frame front with grille, hood and window opening: Window ledge with clear viewing hole | Contact | Lens is pressed in from inside until its front face meets the ledge |
| Large backing washer: Washer faces, one on the plate and one under the nail head Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Fixing holes, two | Contact | Washer bears on the back plate around the hole under the nail head |
| EVA store film blank: Sheet side edges that run in the channels (their centre plane is datum B) Foil pouch: Pouch side seals | Clearance fit | 176.5 mm widest sheet in 184 mm narrowest pouch leaves 7.5 mm |
| Masonry nail: Nail head underside Large backing washer: Washer faces, one on the plate and one under the nail head | Contact | Nail head underside presses the washer onto the plate |
| Wood screw for plugs: Screw head underside Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Fixing holes, two | Contact | Pan screw head bears on the plate around the hole; no washer with screws |
| Spreader plate for crumbling mud (only in kits for weak walls): Spreader front face under the frame Frame back plate with rails, fixing holes, strap slots, locking seat and two breakaway key ribs: Back face that sits on the wall or on the spreader plate | Contact | On crumbling mud the frame back face sits on the spreader front face |
| Rate-control film: Film rear face bonded to the store EVA store film blank: Store film front face, bonded to the pore film | Contact | Pore film is laminated flat onto the store film front face |
| Witness dye, reference bar ink and hidden symbol ink: Dye square Rate-control film: Film rear face bonded to the store | Contact | Dye square sits on the store and under the pore film, so it fades through the same film |
| Witness dye, reference bar ink and hidden symbol ink: Grey reference bar Rate-control film: Film front face (outer face, carries the grey bar print) | Contact | Grey bar is printed on the pore film front face beside the dye square |
| Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting: Liner silicone face, laid on the pore film front face Rate-control film: Film front face (outer face, carries the grey bar print) | Contact | Liner silicone face covers the pore film front face and the window area until pulled |
| Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting: Pull tab Frame front with grille, hood and window opening: Top slot under the hood | Clearance fit | 0.085 mm thickest liner tab in 1.8 mm narrowest top slot pulls out freely |
| EVA store film blank: Sheet side edges that run in the channels (their centre plane is datum B) Frame front with grille, hood and window opening: Top slot under the hood | Clearance fit | 0.635 mm thickest sheet with liner in 1.8 mm narrowest top slot leaves 1.165 mm |
| Liner with spacer foot, including its share of laminating, heat-sealing and die-cutting: Spacer foot Foil pouch: Pouch bottom seal | Clearance fit | 182 mm longest packed liner in 198 mm shortest pouch leaves 16 mm |
| Transfluthrin, one sheet's load: Loaded zone on the store film EVA store film blank: Store film front face, bonded to the pore film | Contact | The dose is coated onto the store film front face inside the seal border |
Parts list and cost to make
About $1 a unit in parts: the sum of the lines below. Estimates at 1 million frames and 1 million sheets a year from regional firms; no supplier quotes yet. A year-one kit is two frames, their fixings, one spreader plate and two pouched sheets. Later years are two pouched sheets, costing $0.40 a year in parts (an estimate). The pouch cost is counted in packaging, so the sheet cost of $0.18 per sheet excludes it. Frame life of 5 years is an estimate.
| Part | What it is | Maker and part number | Qty | Cost |
|---|---|---|---|---|
| Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector Serves SHELL-4, FIX-1, PACE-4, SHELL-3 | Fits the 200 × 150 mm wide × mm tall face; two-plate injection tool; matt texture Fit: Sheet edges in side rails, 178 mm between rail bottoms, sheet 176 mm wide; rail channel 1.2 mm wide for a 0.6 mm sheet edge Rail gap ±0.3 mm; sheet width ±0.5 mm; channel +0.2/−0 mm; Grade selector key and sheet notch, Selector key 3.0 mm wide, 4 mm tall; sheet notch 3.4 mm wide, 5 mm deep; indoor position 49 mm left and veranda position 47 mm right of the rail channel centre plane (datum C) Key and notch width ±0.1 mm; key height and notch depth ±0.2 mm; position ±0.2 mm; Liner foot hold-up and final drop, Foot holds the sheet 3.0 mm above the seat while it stays joined, through the two reinforced side bands, to all liner film on the face; detent click at full drop only after the whole liner is out ±0.3 mm; Front-to-back snap clips, 1.0 mm hook engagement, four clips ±0.1 mm; Fixing holes, 4.5 mm holes, 120 mm apart Hole +0.2/0 mm; spacing ±0.5 mm polypropylene Grade: PP homopolymer injection grade, melt flow about 12 g/10 min (230 °C, 2.16 kg), with HALS UV stabiliser and grey masterbatch | Made for this design | 2 | $0.11 each |
| Frame front with grille, hood and window opening Serves SHELL-1, SHELL-2, MARK-2 | Slots 2.5 mm, set-back 5 mm, open area at least 40% of usable sheet face, snap clips; retain these dimensions only if the complete frame passes the named finger-access tests Fit: Front-to-back snap clips, 1.0 mm hook engagement, four clips ±0.1 mm; Grille set-back from sheet face, 5.0 mm from inner grille face to sheet face ±0.5 mm; Window lens in front opening, Lens 20.0 mm diameter pressed from inside into a 19.7 mm bore behind the 18.4 mm viewing ledge, 0.15 to 0.30 mm interference Lens +0/−0.05 mm; bore +0.1/−0 mm polypropylene Grade: PP homopolymer injection grade with HALS UV stabiliser and grey masterbatch, same as back plate | Made for this design | 2 | $0.10 each |
| Window lens (14) Serves MARK-2 | 20 mm disc, snapped into front Fit: Window lens in front opening, Lens 20.0 mm diameter pressed from inside into a 19.7 mm bore behind the 18.4 mm viewing ledge, 0.15 to 0.30 mm interference Lens +0/−0.05 mm; bore +0.1/−0 mm; Dye square under window, 8 mm dye square, 1 mm gap and 3 mm grey bar (12 mm by 8 mm together), with the 6 mm crossed-out mosquito symbol inside the dye square. All of it is centred under the 18.4 mm clear hole of the 20 mm window when the sheet sits on its seat. By calculation, the worst corner sits about 8.3 mm from the window centre, inside the 9.2 mm clear radius; to confirm on a prototype. Position ±0.8 mm clear polypropylene Grade: Clarified PP random copolymer injection grade with UV stabiliser | Made for this design | 2 | $0.01 each |
| Wood screw for plugs Serves FIX-1, FIX-2 | 4 × 40 mm, zinc plated Fit: Fixing holes, 4.5 mm holes, 120 mm apart Hole +0.2/0 mm; spacing ±0.5 mm Grade: Case-hardened carbon steel, zinc plated to ISO 4042 | standard part, any maker DIN 7505 4 x 40 Proposed: confirm against the datasheet | 4 | $0.004 each |
| Wall plug (34) Serves FIX-1, FIX-2 | 6 mm × 30 mm for block Grade: PA6 | selected at quote catalogue Proposed: confirm against the datasheet | 4 | $0.002 each |
| Masonry nail Serves FIX-1, FIX-2 | Hardened masonry nail, about 3.5 mm diameter and 75 mm long, used with a large backing washer in firm mud Grade: Hardened and tempered high-carbon steel, zinc plated to ISO 4042; the maker's certificate confirms hardness, and the FIX-1 pull test confirms the nail holds | selected at quote catalogue Proposed: confirm against the datasheet | 4 | $0.003 each |
| Large backing washer Serves FIX-1, FIX-2 | For 4 mm fixings, large outer diameter Fit: Fixing holes, 4.5 mm holes, 120 mm apart Hole +0.2/0 mm; spacing ±0.5 mm Grade: Steel 100 HV, zinc plated | standard part, any maker ISO 7093-1 4 Proposed: confirm against the datasheet | 4 | $0.003 each |
| Releasable pole strap (36) Serves FIX-1, FIX-2 | about 8 mm wide, about 300 mm long, reusable release catch, threaded through back slots so it stays with the frame Grade: PA66, UV-stabilised black | selected at quote catalogue Proposed: confirm against the datasheet | 2 | $0.006 each |
| Spreader plate for crumbling mud Serves FIX-2 | About 250 mm by 60 mm, four nail holes; kept only if it passes FIX-1. One per kit, costed in every kit, and fitted only under the indoor frame on a crumbling mud wall; the veranda frame is strapped to a pole and needs none polypropylene Grade: PP homopolymer injection grade with HALS UV stabiliser and grey masterbatch, the same as the back plate | Made for this design | 1 | $0.03 each |
| EVA store film blank Serves STORE-1, STORE-2 | Sheet-sized blank, soaked or coated with the chemical Fit: Sheet edges in side rails, 178 mm between rail bottoms, sheet 176 mm wide; rail channel 1.2 mm wide for a 0.6 mm sheet edge Rail gap ±0.3 mm; sheet width ±0.5 mm; channel +0.2/−0 mm; Grade selector key and sheet notch, Selector key 3.0 mm wide, 4 mm tall; sheet notch 3.4 mm wide, 5 mm deep; indoor position 49 mm left and veranda position 47 mm right of the rail channel centre plane (datum C) Key and notch width ±0.1 mm; key height and notch depth ±0.2 mm; position ±0.2 mm; Grille set-back from sheet face, 5.0 mm from inner grille face to sheet face ±0.5 mm Grade to be selected: see the verification plan | selected at quote catalogue Proposed: confirm against the datasheet | 2 | $0.03 each |
| Transfluthrin, one sheet's load Serves STORE-1, PACE-5 | Load per grade from the value of record Grade to be selected: see the verification plan | selected at quote catalogue Proposed: confirm against the datasheet | 2 | $0.07 each |
| Rate-control film Serves PACE-1, PACE-4, PACE-5, MARK-2 | Filled-pore or dense-skin film; veranda grade has more open area Grade to be selected: see the verification plan | selected at quote catalogue Proposed: confirm against the datasheet | 2 | $0.04 each |
| Witness dye, reference bar ink and hidden symbol ink Serves MARK-1, MARK-2 | One dyed patch plus one print pass Fit: Dye square under window, 8 mm dye square, 1 mm gap and 3 mm grey bar (12 mm by 8 mm together), with the 6 mm crossed-out mosquito symbol inside the dye square. All of it is centred under the 18.4 mm clear hole of the 20 mm window when the sheet sits on its seat. By calculation, the worst corner sits about 8.3 mm from the window centre, inside the 9.2 mm clear radius; to confirm on a prototype. Position ±0.8 mm Grade to be selected: see the verification plan | selected at quote catalogue Proposed: confirm against the datasheet | 2 | $0.01 each |
| Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line Serves SWAP-1, MARK-3, SHELL-3 | Stock patch and label liner, bought by the roll as the established form does. It is cut and its lower end folded into a stiff foot on the same converting line that makes the sheet. Two reinforced bands along both side edges join the foot to the pull tab, so all film on the face stays tied to the foot. The cost includes this liner's share of laminating, heat-sealing and die-cutting. It covers the treated face and the mark, and its pull tab exits the top slot. Fit: Liner foot hold-up and final drop, Foot holds the sheet 3.0 mm above the seat while it stays joined, through the two reinforced side bands, to all liner film on the face; detent click at full drop only after the whole liner is out ±0.3 mm Grade to be selected: see the verification plan | selected at quote catalogue Proposed: confirm against the datasheet | 2 | $0.03 each |
| Foil pouch Serves SWAP-2 | Stock foil laminate sachet film, one pouch heat-sealed around each sheet, printed with the date and grade Grade to be selected: see the verification plan | selected at quote catalogue Proposed: confirm against the datasheet | 2 | $0.02 each |
Key decisions and trade-offs
What sets the release pace: chose Pore film over a full store. It is the test candidate most likely to give a steady daily dose for a year, and ordinary converting lines can repeat it lot after lot. Pore size alone does not prove this. Complete transfluthrin-loaded store-and-film pairs are screened at 25, 30 and 35 °C. A pair is chosen only if it meets five tests: a hot-to-cool ratio of 1.6 or less, month-1 to month-11 release within 10%, useful release every month, the leak limits, and the breathing-exposure limits. Judged on STORE-1, PACE-1, PACE-5, MAKE-2.
| Option | Gains | Costs |
|---|---|---|
| Pore film over a full store (chosen) | The front film with tiny pores sets how fast the chemical leaves. The aim is for the back store to stay full almost to the end, so release stays nearly flat for months. This is to be proven by test. Skin-patch and label lines already make this kind of sheet. | Needs a film screen to find one that softens the heat rise. The sheet must hold extra chemical that stays unused at the end. |
| Bare coated store film | One layer, cheapest to make. It is the same kind of coated plastic sheet the earlier monthly wall product used. | Release starts high and sags as the film empties. Heat speeds it up with nothing to slow it. A year of life would need a very large overload. |
| Liquid with a wick | Easy to load. The scent-diffuser trade already measures it by weighing. | Liquid can spill or leak, and children can reach it. The scent trade found that more wick surface used more liquid without working better, so the pace is hard to hold steady. |
What the other options would have risked: A bare store would run high early and weak late. That risks too much chemical in the air for sleepers at startup and false comfort in the last months. A wick adds spill and child-contact risk.
How the veranda gets more release: chose Second sheet grade, same size, keyed. It keeps one mould family and one frame. Only the film changes. The key stops a high-release veranda sheet from going into an indoor frame by mistake. Judged on PACE-3, PACE-4, PACE-2, MAKE-1.
| Option | Gains | Costs |
|---|---|---|
| Second sheet grade, same size, keyed (chosen) | One frame body serves both spaces. The veranda sheet has more open pore area. A captive grade selector is set once to indoor or veranda and locked there. It always leaves a solid stop that keeps the wrong grade from seating. | Two sheet stock items for the factory and the campaign to track. Needs a selector that stays locked and keeps rejecting the wrong grade for 5 years. |
| Two indoor sheets on the veranda | Only one sheet type to make. | Three sheets per home per year raises the yearly cost. Two sheets may still fall short in wind. |
| Bigger veranda frame | More release face with the same film. | A second mould tool and a second frame stock item. The frame no longer fits the single 200 by 150 mm form. |
What the other options would have risked: Extra sheets break the cost target. A bigger frame doubles tooling. Without a key, a veranda sheet indoors could put far too much chemical into a closed room at night.
How the household knows to replace: chose Dye square behind the same pore film. It is the candidate signal most likely to age with the sheet's real release, and it reads in one look with no words. It stays unproved until paired landing tests run to real failure. Those tests must meet the mark requirement for both grades at every required age, temperature, airflow and soot state. Judged on MARK-1, MARK-2, MARK-3.
| Option | Gains | Costs |
|---|---|---|
| Dye square behind the same pore film (chosen) | The aim is for it to fade as release falls, so it tracks heat and use. Dye and transfluthrin can move through the same film at different speeds. So the dye mix, the layer it sits in and the colour change point are set and measured as a separate system. It needs no power, and anyone can read it next to a printed grey bar. | The fade must be tuned to land about one month before protection fails, at every temperature from 25 to 35 °C. That needs paired landing tests. |
| Printed expiry month | Free to add and easy to make. | It ignores heat. A sheet in a hot home could be spent months before the date, while still looking fine. |
| Weight or thickness gauge | Tracks how much chemical is left. | The scent trade found useful life can end while liquid still remains, so chemical left does not mean protection left. |
What the other options would have risked: A date or a fill gauge could show 'still good' after the air level has dropped. Families would then think they are covered when they are not.
How the treated face is covered until use: chose Peel-off liner pulled out through the top slot. The liner is one reinforced, tear-resistant piece. A cross-laminated film is a candidate because bonding layers with their grain at angles may improve tear resistance; retain it only if deliberately torn liners meet the 100-of-100 incomplete-removal lock and mark requirements. Its foot runs the full width of its bottom edge, and the window cover sits in that same bottom strip. These are the last parts to leave as the tab is pulled from the top. Two reinforced bands run up both side edges, from the foot to the pull tab. The lock is tied to the whole cover path. All film over the face stays joined to the foot through those bands, so the foot leaves only after the last face film has gone. If a tear frees the upper film, the foot, the window cover and the film below the tear stay in place. The target is that any liner left on the face keeps the sheet off its final seat and shows liner colour in the window. This is a target to be proven. Liners torn on purpose at several places must leave all 100 incomplete removals unlocked and showing liner colour. If that cannot be reached, the foot is dropped and another lock is chosen. Judged on SHELL-3, MARK-3, SWAP-1.
| Option | Gains | Costs |
|---|---|---|
| Peel-off liner pulled out through the top slot (chosen) | Hands never touch the treated face. The aim is for any liner film left on the face to keep the sheet up off its final seat. The foot does this, and two reinforced side bands join every part of the face cover to the foot. This is to be proven by tear tests. Liner film is stock patch material. | The liner needs a folded foot and a pull tab, which adds a die-cut and fold step. |
| Foil with a tear strip inside the frame | One fewer film in the sheet. | A torn strip can leave foil over part of the face, and the frame cannot tell. The tear force varies with heat. |
| Bare sheet straight from the pouch | Cheapest. | Fingers touch the treated face during the swap. Chemical starts leaving before the sheet is in place. |
What the other options would have risked: A foil strip could leave half the face covered while the window looks normal. A bare sheet puts chemical on hands.
How the frame is held up: chose Screws, plugs, nails, washers and captive pole strap. Each fixing can be pull-tested on each wall type. Any untested wall gets marked 'do not fit'. Judged on FIX-1, FIX-2, FIX-3.
| Option | Gains | Costs |
|---|---|---|
| Screws, plugs, nails, washers and captive pole strap (chosen) | Stock hardware fits block, firm mud and poles. A spreader plate covers crumbling mud. The strap stays threaded in the frame so it does not get lost. | Needs a hammer or screwdriver. Each surface must pass a pull test. |
| Tape or glue pad | No tools. | Household visits in the earlier Kenyan trial found that tape did not stick well to some walls. |
| Hanging hook | Fast to fit. | The same visits found that hooks fell off or were used to hang other things. |
What the other options would have risked: Tape and hooks would let frames fall or move. A fallen frame protects no one and puts the sheet within a child's reach.
How the frame is built: chose Two snap-together polypropylene mouldings. It keeps tooling simple for regional moulders and gives rails strong enough to hold the sheet for 5 years. Judged on SHELL-1, SHELL-4, MAKE-1, MAKE-3.
| Option | Gains | Costs |
|---|---|---|
| Two snap-together polypropylene mouldings (chosen) | Two simple two-plate tools that any regional moulder can run. No screws. The slot opening forms between the two parts, so neither part needs a side action (an extra moving slide in the mould). | Two tools. The snap clips must be sized for polypropylene's stretch. |
| One-piece moulding | One tool, no assembly. | The hidden top slot and hood become undercuts, which need side actions and a costlier tool. |
| Vacuum-formed sheet shell | Very cheap tooling. | Weak clips and rails, so it would struggle to last 5 years in sun and heat. |
What the other options would have risked: A one-piece part raises tool cost and limits the number of moulders who can make it. A formed shell risks cracked clips and a lost sheet.
Failure modes
How it could fail in use, what prevents it and the test that checks it. Severity is 1 to 10; how often and how detectable each is need test data, so they are left for the prototype tests.
| Failure | Effect and cause | Control and check | Severity |
|---|---|---|---|
| Release drops in heat, wind or soot while the dot still looks blue | Family members are bitten in the evening while believing they are protected. Cause: Heat empties the store early at 35 °C. Late-life sag. Wind or soot cuts the useful air level faster than the dye fades. | The pore film sets the pace. The load is sized from the 35 °C case plus a spare month. The dye is tuned to fade about one month before landing failure, clean and with soot. Check: Monthly release at 25, 30 and 35 °C by whole-sheet weighing plus chemical analysis of matched sheets. Each dye reading is paired with a landing test for the same grade, age, heat, airflow and soot condition, run until real failure. | 9 |
| Too much chemical in the air | Sleepers, children, pregnant people or pets breathe more than their safe limit. Cause: A fresh sheet at 35 °C, both units running, or a veranda sheet forced into an indoor frame. | Captive grade selector, locked for good in one position. Indoor sheet with less open pore area. Startup peak measured. A named limit for each covered group, set before testing. Check: Air sampling starts at liner removal. Samples are taken at intervals short enough to catch the startup peak (interval to confirm before testing) and continue through a full overnight period. Samplers sit at the nearest allowed sleeper, child and pet breathing positions. Tests run with both units on, with aged sheets, and with sheets at the highest allowed production release. Air movement between the room and the veranda is measured. Each result is compared with the documented limit for its named group, with the method and uncertainty recorded. No occupied-home trial starts until every group passes. The grade selector is also tested with 100 wrong-grade insertions after it is locked. | 8 |
| Child touches or chews a sheet | Chemical gets on skin or in the mouth. Cause: Sheet left out after the swap, an opened pouch, or fingers poked through the grille. | 2.5 mm grille slots with the sheet 5 mm behind them. Liner covers the face until the sheet is in. At the yearly swap, the adult lifts the old sheet out by its clean tab and slides it straight into the empty foil pouch from the new sheet. The adult folds the pouch top over twice at once and stores it above child and pet reach until the campaign collects it. The team re-pouches it at hand-in. Check: Jointed test-finger check to IEC 61032 probe B (12 mm across, 80 mm long, pushed with 10 N) plus a straight rigid 3.0 mm rod pushed with 3 N. Both run on a complete frame moulded at the widest allowed slot of 2.6 mm (2.5 mm plus its 0.1 mm tolerance). The slots are 2.5 mm, narrowed from the earlier 3 mm because a straight 3 mm probe could pass through a 3 mm slot. Hand-wipe chemical test after 100 adult swaps. Each swap includes moving the old sheet into the folded pouch by its tab. | 7 |
| Families stop using bed nets | Night-time bites rise and more children get malaria. Cause: Households assume the device replaces nets, as some did in the earlier Kenyan trial of the monthly sheet. | Label and hand-out pictures say nets stay needed. No dengue claim. Check: Understanding check with 100 users. Reported and observed net use at each trial visit. | 8 |
| Veranda vapour blown past the seats | People sitting outside in the evening get little protection. Cause: Evening breeze stronger than the tested range. | Breeze-side pole mount at about 1.5 m. A veranda grade with more open pore area. A labelled wind limit taken from the highest steady range that passed repeatedly. Check: Landing tests in a roofed, side-sheltered 10 m² space. Wind is logged at 1 to 4 m height beside the unit every 5 minutes. | 7 |
| Soot clogs the grille or coats the film | Protection fades early in kitchens. Cause: Cooking smoke settles on the face. | Hood over the top slot. Grille open area at least 40% of the usable sheet face. Unit fixed at least 1 m from the cooking fire. Check: Defined soot exposure, then release compared with clean sheets. The dirty unit must still pass the landing and dye-reading tests. | 6 |
| Frame falls or is pulled down | No protection, and the sheet ends up within a child's reach. Cause: Nails loosen in crumbling mud, or the strap is cut and reused. | Spreader plate for weak walls. Strap held captive in the back slots. Untested surfaces marked 'do not fit'. Check: A 50 newton pull for 1 minute on each fixing and each wall type. A newton is the force of a 100 g weight hanging. Frames checked at month 12. | 5 |
| Uneven loading or leaky edge seals at a regional line | Some sheets run out early. Others weep chemical onto hands. Cause: Loading line drift or a poor heat seal. | Load within ±10% of the value of record. Every lot weighed. Glue-free heat seals. Shelf samples kept from every lot. Check: Weighing of lot samples. Seal-leak check on 200 sampled sheets per pilot lot. Edge-wipe chemical recovery after 30 days at 40 °C. | 7 |
| Melted chemical weeps in hot storage | Oily residue in the pouch or on fingers. Cause: Transfluthrin melts at about 32 °C, inside the use range. | Chemical held dissolved in the EVA (soft rubbery plastic) store. Foil pouch around each sheet. Check: Edge wipes and pouch loss after 2 years at 35 °C. The sheet must then still pass the landing test. | 5 |
Approvals to plan for
The standards the Invention Commons Protocol expects for what this is and what it is made of. Each is a candidate: a test lab confirms its scope and edition.
- CPSIA (children's products, US) Candidate
- EN 71 and the General Product Safety Regulation (EU) Candidate
- CLP labelling where it holds a chemical Candidate
- National pesticide registration in each country of sale, WHO prequalification spatial emanator interim guidance, and Global Fund quality assurance policy for vector control products; the product has no mains power supply, so no electrical safety listing applies Candidate
Cost at volume
The cost of each unit at each volume. A one-off prototype costs more and is quoted by the prototype shop.
| Units | Cost each | Basis |
|---|---|---|
| 100 | $14 | Judgment: 3D-printed frames, hand-laminated sheets, per household kit |
| 1,000 | $4.2 | Judgment: soft aluminium tools, short converter runs |
| 10,000 | $1.6 | Judgment: steel tools, pilot converter lots, not yet amortised |
One-off tooling
- Two-plate mould for the back plate with rails, seat, selector track, a tethered cavity for the grade selector slide, and fixing holes (estimate, to confirm by quote): $12,000
- Two-plate mould for the front with grille, hood and clips (estimate, to confirm by quote): $14,000
- Small mould for the 20 mm window lens (estimate, to confirm by quote): $3,000
- Steel-rule die for the sheet outline, tab, grade notch and dye square (estimate, to confirm): $1,500
- Heat-seal bar set for sheet edges and pouch (estimate, to confirm): $1,000
- Go/no-go gauges for the slot, rail gap and grade key, plus a 50 newton pull fixture (estimate, to confirm): $1,200
One-off engineering and certification: $150,000
A unit is one household kit: two frames, two sheets, fixings and two straps, in the first year. All figures are judgments to confirm by quote. At full volume the parts list adds to about $0.90 per kit in the first year: frames $0.44, fixings and straps about $0.06, two pouched sheets $0.40 (two sheets at $0.18 plus two pouches at $0.02). Spread over a 5-year frame life, that gives about $0.10 for frames plus $0.36 for sheets plus $0.04 for pouches, $0.50 per household-year, under the $1 target. One pouched sheet costs $0.20 (estimate). The sheet itself is $0.18, the sum of its own parts-list lines: $0.03 store film, $0.07 transfluthrin, $0.04 rate-control film, $0.01 dye and inks, and $0.03 liner. Its foil pouch is a separate $0.02 parts-list line, which the cost requirement counts as packaging. So the yearly sum stays $0.10 for frames plus $0.36 for sheets plus $0.04 for pouches, which is $0.50. A total of $0.54 would count the two pouches twice. Both remain estimates until independent regional converter quotes confirm them. The parts list buys stock siliconised PET liner (clear bottle plastic with a non-stick silicone coat) by the roll; cutting, edge reinforcement and folding the foot are operations on the sheet line, counted inside the liner's $0.03 share. Engineering cost covers design, film screening and bench release tests. It excludes the WHO prequalification file, safety studies, semi-field landing tests and household trials, which are to confirm with test sites. Delivery, fitting, collection and disposal are costed separately. Planning estimates, not supplier quotes.
Making and assembling it
Assembly order
- Mould the back plate and the front, then let them cool and settle Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector, Frame front with grille, hood and window opening
Check before the next step: Rail-gap gauge passes, the selector slide is snapped captive in its track in the middle start position, and no short shots appear on the grille. - Snap the lens into the front from inside Window lens (14), Frame front with grille, hood and window opening
Check before the next step: The lens sits flush and does not push out under thumb force. - Snap the front onto the back plate Frame front with grille, hood and window opening, Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector
Check before the next step: All four clips are engaged, the top slot gauge passes at 2 mm, and the grille set-back measures 5 mm. - Thread the strap through the back slots and bag the frame with its fixings Releasable pole strap (36), Wood screw for plugs, Wall plug (34), Masonry nail, Large backing washer, Spreader plate for crumbling mud (only in kits for weak walls)
Check before the next step: The bag holds the right count of each item, and the strap catch works. - Print the hidden symbol on the store film, load the store film with transfluthrin and lay the dye patch over the symbol EVA store film blank, Transfluthrin, one sheet's load, Witness dye, reference bar ink and hidden symbol ink
Check before the next step: Sample sheets weigh within ±10% of the load value of record. - Print the grey bar beside the dye, then laminate the pore film for the grade over store, dye and prints Rate-control film, Witness dye, reference bar ink and hidden symbol ink
Check before the next step: The correct grade roll is in use, the grey bar is registered beside the dye square and the symbol lies beneath the dye, and the tab colour matches the grade. - Apply the liner, fold its foot, heat-seal the edges and die-cut the outline, tab and grade notch Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line
Check before the next step: The seal is complete all round, the notch is in the right position for the grade, and the foot is folded. - Seal each sheet in a foil pouch printed with date and grade Foil pouch
Check before the next step: Pouch seal leak check on samples; retained shelf samples set aside. - In the home, the trained installer sets the grade, fixes the frame and fits the first sheet Frame back plate with rails, fixing holes, strap slots, locking seat and captive grade selector, EVA store film blank, Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line
Check before the next step: The selector is pushed to the indoor or veranda end and locks there. A wrong-grade sheet will not seat. The frame holds firm. The sheet clicks down only after the liner is fully out, and the window shows blue.
Making it
- Draft: 2° on all outer textured faces and 1° on inner walls and rails. The parting line runs along the back edge of the front part, off the visible face. The gate sits on the inside of the back plate.
- Walls: 2.0 mm polypropylene throughout. Rails, seat and the selector track are 1.1 mm thick, about 55% of the wall they join. The grade selector is a small slide moulded in the same back-plate tool as a tethered extra part. At assembly it snaps into a track along the seat, and it cannot then be removed. It starts in a middle position that blocks both grades. The installer pushes it to the indoor end or the veranda end, where a one-way barb locks it for good. Its key, 3.0 mm wide across the sheet, 4 mm tall above the seat and 1.1 mm thick front to back like the track it rides in, then always stands as a solid stop for the wrong grade.
- No side actions: the grille slots are straight through-holes in the flat face. The top drop-in slot is the 2 mm gap left between the front and back parts once they snap together, so the hood never forms an undercut.
- Joining: four moulded snap clips with 1.0 mm hook engagement, sized for polypropylene's allowable stretch. The parts go together in one direction, front onto back, with no screws. The lens snaps into the front from inside before the halves close.
- Sheet line: print the hidden crossed-out mosquito symbol on the store film in fade-proof ink, load the EVA store with transfluthrin, lay the dye square over the symbol, print the grey bar beside it in fade-proof ink, laminate the pore film over store, dye and prints, then apply the liner. Section drawing, bottom to top: store film, symbol, dye, pore film. Heat-seal the edges without glue, die-cut the outline, tab and grade notch, and seal each sheet into its foil pouch on a standard sachet machine.
- End-of-line frame check: every frame passes a go/no-go slot gauge and a rail-gap gauge. With its selector captive in the middle start position, every frame must block both a dummy indoor sheet and a dummy veranda sheet. It is then bagged still in that start position. Sample frames are taken from every lot to check the locked ends. Each sample is pushed to the indoor or veranda end, the right grade must seat, and the wrong grade must be blocked. Because that lock is permanent, each tested sample is then scrapped and never bagged. The installer repeats the right-grade and wrong-grade check in each home after setting the grade.
- End-of-line sheet check: weigh sample sheets from every lot against the load value of record, check pouch seals for leaks, and keep retained shelf samples from every lot. There are no electronics, so no antenna or battery rules apply.
What could go wrong
| Risk | Likelihood | Severity | Kind | First check | Threatens |
|---|---|---|---|---|---|
| Release falls in heat, soot or wind while the dot still looks blue, so families think they are covered when they are not. This is the dominant failure. The film sets the pace, the load is sized from the hot case, and the dye is a separately tuned witness calibrated against landing failure, clean and sooted. | Medium | High | Safety | The SYS-2 gate: year-end landing tests plus twelve-month paired dye ageing at three temperatures, clean and sooted, through a WHO-prequalification-recognised facility, before any home trial. | SYS-2 |
| Too much chemical in the air for sleepers, children or pets: a fresh sheet at 35°C, both units running, or a veranda sheet forced into an indoor frame, which could release tens to hundreds of times the indoor need. Breakaway grade key; startup peak measured; exposure limits named per group before testing. | Medium | High | Safety | PACE-2 inhalation exposure assessment and wrong-grade fit trials. | PACE-2 |
| A child handles or chews a sheet or an opened pouch. Finger grille, liner covers the face until the sheet is in, spent sheets re-pouched at hand-in. | Medium | Medium | Safety | SHELL-1 probe test, SWAP-1 hand wipes, label review by the exposure assessors. | SHELL-1 |
| Families stop using bed nets, as some did in a Kenyan trial of the monthly sheet reported by the Johns Hopkins group. Labels and hand-out messages say nets stay needed; no dengue claim. | Medium | High | Liability | SWAP-3 comprehension interviews and observed net use at every trial visit. | SWAP-3 |
| A live patent in a making or selling country covers part of the design; public-domain release cannot cancel another owner's rights. Full read of the closest filings and legal-status check in Tanzania, India and Nigeria. | Medium | High | Liability | Patent attorney freedom-to-operate opinion before production. | MDO-3 |
| No stock film flattens the heat rise, because air-filled pores pass on almost the whole about 2.9 to 3.7 times rise; the load would then grow to 42.9 months of minimum useful release (2.2 times the target load). Screen filled-pore and dense-skin films first; kit stays under the ceiling even at 0.94 $ per household per year, but this opens the heat-slide review. | High | Medium | Might not work | Release coupon screen (the experiment below). | PACE-1 |
| Veranda wind carries the vapour past the seats; evenly mixed air would need about 18 to 450 times the indoor release. Breeze-side pole mount and a veranda grade with more open area; Debbie's recorded fallback is the roof-edge strip design. | High | High | Might not work | PACE-3 veranda landing tests across repeated wind directions. | PACE-3 |
| Kitchen soot clogs the grille or coats the film and cuts release. Hood over the top, wide grille open area, fixed distance from the fire. | Medium | Medium | Might not work | SHELL-2 soot exposure tests. | SHELL-2 |
| Nails loosen in crumbling mud or straps get removed and lost. Spreader plate for weak walls, kept only if it passes; strap held in the frame slots; untested surfaces marked do not fit. | Medium | Medium | Might not work | FIX-1 pull tests and the 100-home check at year end. | FIX-1 |
| Regional loading lines give uneven load or leaky seals. Pilot lots at a qualified converter, then transfer of the same open process with weighing of every lot. | Medium | High | Hard to make | MAKE-2: load plus or minus 10% of the value of record, spread plus or minus 15%, zero leaks in 200 sampled sheets. | MAKE-2 |
| The sheet costs more than 0.18 $ per sheet, and the pair passes Debbie's 0.40 $ per household per year trigger with only a few cents more per sheet. Quotes at stated volume before tooling; cost tracked per lot. | Medium | Medium | Hard to make | MAKE-1 independent quotes. | MAKE-1 |
| Transfluthrin melts at about about 32°C and could weep through seals in hot storage. Load kept dissolved; glue-free heat seals; foil pouch. | Low | Medium | Hard to make | STORE-2 and SWAP-2 storage tests at under 1% of load after 2 years at 35 °C. | SWAP-2 |
| In the failure modes: The child-touching control re-pouches spent sheets only at campaign hand-in. Supply a closing return sleeve with each refill. | Medium | High | Might not work | To confirm | Whole product |
| In the cost estimate: The section uses $0.20 per refill while MAKE-3 records $0.18, and its $0.50 annual calculation omits the required $0.04 packaging. Show $0.54 as the current calculation. | Medium | Medium | Might not work | To confirm | MAKE-3 |
| PACE-4, the grade key and veranda grade requirement, repeats the MD-7 cost estimate, so a reader may treat the grade key work as the place where cost is proven. MAKE-1 holds the only cost check, through independent maker quotes. Debbie and the agents treat the cost lines in PACE-4 as a copy of MD-7 that PACE-4 testing does not prove. | Low | Low | Might not work | To confirm | PACE-4, MD-7 |
| The same key ribs have two thicknesses in consecutive making instructions. After replacing the breakaway selector, specify one thickness for each retained stop and locking feature. | Medium | Medium | Might not work | To confirm | Whole product |
| The stated minimum wall-entry depth cannot be reached by the listed 40 mm screw after it passes through the frame. Specify wall-entry depth separately from screw length. | Medium | High | Might not work | To confirm | Whole product |
| The setting block records 30000 litres, 100000 square centimetres and 35 degrees Celsius in a field keyed as millimetres, so any reader or tool that trusts the key instead of the size text misreads room volume, veranda area and temperature as lengths. The size and source strings already name the true unit for each value; the next engineering schema revision adds separate value and unit fields and the three entries are moved into them before any maker drawing is cut from this block. | Medium | Low | Might not work | To confirm | Whole product |
| The earlier text priced the sheet itself at $0.20. Settle it with the matching test in the verification plan before parts are ordered. | Medium | High | Might not work | To confirm | Whole product |
| The original 40 mm minimum wall-entry depth has become a 40 mm drilled-hole depth. Settle it with the matching test in the verification plan before parts are ordered. | Medium | High | Might not work | To confirm | Whole product |
| The selling price is $0.9 in concept, $0.2 in engineering and $0.18 in engineering. Settle it with the matching test in the verification plan before parts are ordered. | Medium | High | Might not work | To confirm | Whole product |
| The package gives selling price as $0.9 in the chosen design and as $0.2 in the engineering section; work done to the wrong one will be wrong. Settle it with the matching test in the verification plan before parts are ordered. | Medium | High | Might not work | To confirm | Whole product |
| The change introduces a lower minimum wall-entry depth to make the existing screw fit. Settle it with the matching test in the verification plan before parts are ordered. | Medium | High | Might not work | To confirm | Whole product |
Business case
| Selling price | 0.90 $ per household-year, ex-factory |
| Parts, chemical and packaging | 0.50 $ per household per year |
| Production loss and quality checks | 0.10 $ per household-year |
| Maker contribution | 0.30 $ per household-year |
| Reachable market | 6 million household-years per year |
| Household coil spend the unit sits beside | 7 to 18 $ per household per year |
| Price against Guardian | Estimate only |
The invention and how it works
A two-part passive repellent unit. A plain grey frame stays fixed for 5 years. A factory-sealed sheet goes in once a year. The sheet holds transfluthrin dissolved in a soft store film. A front film makes the chemical creep through solid plastic before it reaches the air, which flattens the rise in release between 25°C (degrees Celsius) and 35°C. Each household gets two identical frames, one in the 30 m3 (cubic metres of room air) room and one on the 10 m2 (square metres of floor), roofed and side-sheltered sheltered veranda, set by a breakaway key to take a blue indoor sheet or an orange veranda sheet. A dye square behind the same film pales when the sheet is spent. The whole kit is priced under 1.00 $ per household per year ex-factory, with 0.50 $ per household per year as the parts estimate.
It adds protection in the evening hours before bed, alongside bed nets, which households keep using at night. Programmes hand out the frames and sheets through the same mass campaigns that deliver nets. Each year a new sheet pair comes through that channel and the spent pair goes back.
- Factory loads the store. The sheet maker soaks or coats EVA film with transfluthrin at or below the amount the plastic can hold dissolved at 25°C (degrees Celsius). Transfluthrin melts at about about 32°C, inside the working range, so keeping it dissolved stops it pooling or running. The load is set from the measured release at 35°C for 12 months plus 1 month of spare time.
- Factory adds the pace film, mark and liner. A rate-control film is laminated over the store and the edges are heat-sealed with no glue. A small dyed patch sits behind the same film at the lower right corner, beside a fade-proof grey bar, with a crossed-out mosquito printed under the dye. A siliconised liner covers the face and the mark. Its lower end is folded into a stiff foot.
- Factory seals and ships. Each sheet goes into its own foil pouch printed with date and grade: blue tab for indoor, orange tab for veranda.
- Frames go up. The indoor frame goes about about 1.1 m above the floor, at least 1 m from the cooking fire. The veranda frame is strapped to a roof pole on the side the evening breeze comes from, about about 1.5 m on the breeze-side pole high, window facing the seats. Screws and plugs go into block walls, long nails with large washers into firm mud. The installer breaks off one key rib, so the frame then takes only the matching grade. Who fixes the frames, the delivery team or the household, is still open: Debbie has not recorded that decision, so the fixings are tested for both.
- Household slides the sheet in. The household tears the pouch, holds the sheet by its tabs and slides it down the rails under the hood. The grille keeps fingers 5 mm away from the treated face.
- Household pulls the liner. The household pulls the liner tab up and out through the top slot. While any liner remains, its foot holds the sheet above the locking seat and its colour covers the window. When the last of the liner leaves, the sheet drops a few millimetres and clicks into the seat, and the blue dot appears in the window.
- Chemical leaves at a steady pace. The chemical dissolves into the front film, creeps through it and leaves its outer face as vapour. A bare surface would speed up about about 2.9 to 3.7 times from cool to hot, since evaporation follows Clausius-Clapeyron with a heat of evaporation of about about 80 to 100 kJ/mol. To reach the 1.5 times (release at 35 °C ÷ release at 25 °C) target, the slowest step must respond to heat about one third as strongly, an apparent activation energy (a measure of how much a process speeds up with heat) of about about 31 kJ/mol (apparent activation energy), and no more than about about 36 kJ/mol for the pass. Air-filled pores cannot do this, because vapour in the pores still follows the store's vapour push. So the film must have filled pores or a dense skin. Whether a stock film does this is unknown until it is measured.
- Room and veranda get covered. Indoors the vapour mixes into room air that changes at about 30 to 150 m3 per hour. On the veranda the breeze carries 2,700 to 13,500 m3 per hour, so evenly mixed air would need about about 18 to 450 times the indoor release. Extra pore area cannot close that gap. The veranda unit works only by sitting on the breeze side, where its vapour crosses the seats in about about 6 seconds as a narrow stream. The veranda grade has more open film area, and its wind limit comes from the landing test.
- The mark pales. The dye leaves through the same film, so it sees the same heat, airflow and soot. Its loading is tuned separately and checked directly against landing failure, so the blue dot turns grey and the crossed-out mosquito shows within 30 days of protection being lost.
- Yearly swap and return. The household slides the spent sheet out by its tabs, puts it in the new sheet's pouch and hands it back through the campaign channel. In a cool home about 38% of load of the chemical is still in the spent sheet, against about 72% of load if the film gave no flattening.
What's new against the named prior art
| Prior art | What it does | What this adds |
|---|---|---|
| SC Johnson Guardian | A WHO-approved passive transfluthrin device from one maker that lasts up to 12 months indoors, with no public price and no open design. | Covers a sheltered veranda as well as the room, uses an open public design regional firms can build, and gives a mark tied to measured loss of protection. |
| SC Johnson Mosquito Shield | A WHO-approved coated plastic sheet designed for 28 days, hung with tape or hooks that a Johns Hopkins university group saw fail in Kenyan homes. | A yearly sheet behind a rate-control film, in a screwed, nailed or strapped frame with a soot hood and finger grille. |
| Mossie-GO | An outdoor transfluthrin device on trial that uses a solar panel and fan, with discs changed monthly. | No power, no moving parts and a yearly sheet. |
| Mosquito coils | Burning spirals that protect for one evening and fill the home with smoke. | No burning and no nightly purchase. |
| Hot Shot No-Pest Strip | A hanging insect strip from Spectrum Brands that releases from a plastic store with no power, labelled to stay out of rooms where people spend long periods. | Made for occupied rooms, with a pace film, a sealed refill, a spent-mark and a breathing-exposure gate before home use. |
| US6296866A | A filed slow-release insect-control device; the brief notes it uses a liquid dish under a membrane. | The chemical is held dissolved in a solid film store, with no liquid, plus a witness dye behind the same film and a liner-gated lock. |
| US20130251773A1 | A filing on slow-release repellent materials; the brief notes the repellent is held in fibres. | A laminated solid film store with a rate-control film, used as a sealed refill in a keyed frame. |
| US9700041B2 | A filing on a repellent patch worn on the body. | A wall or pole frame for a room and veranda, with a yearly refill and window mark. |
- The sheet clicks into its seat and shows its mark only after the whole liner is gone.
- A dye patch behind the same rate-control film, tuned separately and checked against landing tests, shows when protection ends.
- Two identical frames are set once by a breakaway rib to take only the indoor or only the veranda grade.
- The chemical must cross solid plastic to leave, which is the only route that can flatten the heat rise; air-filled pores cannot.
- An open public design built on lines regional net and plastics makers already run.
Payback
| Input | Low | Mid | High | Basis |
|---|---|---|---|---|
| Development and qualification spend ($) | 2.5 million | 1.51 million $ | 0.8 million | Assumption Plan phase estimates; low adds a repeat trial, high assumes trial co-funding |
| Household-years sold per year | 0.5 million household-years per year | 2 million household-years per year | 6 million household-years per year | Assumption Scenario judgments |
| Contribution per household-year ($) | 0.20 | 0.30 $ per household-year | 0.40 | Assumption 0.90 $ per household-year, ex-factory less parts and losses; low and high move parts cost by about $0.10 |
| Selling price per household-year | 0.90 $ per household-year, ex-factory | 0.90 $ per household-year, ex-factory | 0.90 $ per household-year, ex-factory | Assumption One price in every case |
| Result | 25 years (2.5 million ÷ 0.1 million a year) | 2.5 years (1.51 million ÷ 0.6 million a year) | about 4 months (0.8 million ÷ 2.4 million a year) |
Every input is an estimate. The payback depends on three things: what the WHO-prequalification trials really cost, whether the sheet comes in near 0.18 $ per sheet, and whether a programme orders at base volume. On the estimates, the mid case would land inside the 5 years pass mark and the downside would not. This is tested by converter and moulder quotes (MAKE-1), the facility's trial quote, and a first tender. Until those come in, the case is not shown to pay back.
Plan to get it made
| Phase | When | Cost | Goal | Kill test |
|---|---|---|---|---|
| Release coupon screen | Months 1 to 4 | $60,000 (estimate) | Pick a store-film and front-film pair and fix the ratio of record. Moves on when: One pair per grade chosen, with load and useful-release values of record set. | No pair gives a ratio of 1.6 times or below or below, and the heat-slide review cannot keep the kit under 1.00 $ per household per year. |
| Frame tooling and fixing tests | Months 3 to 6 | $50,000 (estimate) | Cut the two-plate tools; prove finger guard, liner-gated lock, grade key and fixings. Moves on when: Frames pass SHELL-1, SHELL-3, PACE-4 and FIX-1 pull tests. | Any fixing route fails 50 N for 1 minute with under 2 mm movement newtons (a newton is about the weight of a 100 g apple) with no listed alternative for that surface, or the liner gate fails any of liner pulled 0%, 50%, 90% and 100%; 100 of 100 incomplete fits show liner colour and stay unlocked. |
| Pilot sheet lots, ageing and safety | Months 5 to 18 | $400,000 (estimate) | Run pilot lots at a qualified converter; age sheets and marks for 12 months at three temperatures, clean and sooted; complete the inhalation exposure assessment. Moves on when: STORE, PACE-2, PACE-5, MAKE-2 and MARK-1 pass. | Any covered group's exposure exceeds its documented limit, or the mark misses 30 days in any condition after retuning, or lots miss zero leaks in 200 sampled sheets. |
| Semi-field landing tests | Months 6 to 20 | $600,000 (estimate) | Year-end landing tests in a 30 m3 (cubic metres of room air) room chamber and a 10 m2 (square metres of floor), roofed and side-sheltered sheltered veranda at a WHO-prequalification-recognised facility such as Ifakara Health Institute, a Tanzanian research institute the inventor's digest names as an established test site. Moves on when: SYS-1 and SYS-2 pass; wind limit of record set. | Either space gives less than 70% fewer landings at year end, and the veranda fallback roof-edge strip also fails. |
| Regional transfer, home check and dossier | Months 18 to 30 | $400,000 (estimate) | Qualify regional moulders and net makers on the open process; run the 100-home check; file the prequalification dossier. Moves on when: Dossier filed, open specification published, first tender bid. | Regional quotes put the kit at under 1.00 $ per household per year or more, or fewer than 95 of 100 frames remain fixed and aimed. |
Who makes what
- Frame back plate, front, lens and spreader plate: Regional injection moulder, for example in India or Nigeria
- Pilot sheet lots: Qualified patch, label or flexible-packaging converter
- Production sheets: loading, laminating, sealing, die-cutting: Regional net or textile maker that already handles insecticide-treated polymers, such as A to Z Textile Mills, a Tanzanian bed-net maker
- Pouching: The sheet maker on a standard sachet sealer
- Transfluthrin: Licensed chemical maker, for example one of the listed Indian suppliers
- Fixings and strap: Stock hardware supplier, bagged by the moulder
- Landing, air and exposure tests: WHO-prequalification-recognised test facility working under good laboratory practice, plus qualified inhalation assessors
Next actions
- The agents order candidate EVA and filled-pore or dense-skin films and book the coupon screen.
- The agents ask a WHO-prequalification-recognised facility to quote the landing, air and exposure work.
- Debbie records who fixes the frames: the delivery team or the household.
- The agents get moulder and converter quotes at 1 million units a year.
- A patent attorney reads the closest filings in full and checks their status in Tanzania, India and Nigeria.
- The agents obtain the invention slot register before any unused-ground claim.
Features believed to be new (no patent search performed)
- Final seating and mark display both depend on full liner removal.
- Witness dye behind the same rate-control film, tuned separately against measured protection loss.
- Captive grade selector on otherwise identical frames, initially blocking both grades and permanently locking at the installer-selected indoor or veranda position to block the wrong refill.
- Repellent kept dissolved below its solubility limit so it cannot pool above its melting point.
Verification plan
Every test is proposed until the prototype shop returns its result, recorded against the ID in the first column.
| ID | Requirement | Test | Passes when |
|---|---|---|---|
| STORE-1 | Must · The sheet is packed for the hottest year, plus a month to spare, and it gives out about the same amount every day until the last weeks. | Weigh whole framed sheets every month for 12 months at 25, 30 and 35 °C. Each month, cut matched sheets and measure the transfluthrin left by chemical analysis, because weight loss can also include other substances. | Set each grade’s load from its measured framed release at 35 °C over 12 months plus one spare month. Release at 35 °C stays within 10% of its month-1 value through month 11. Verify monthly at 25, 30 and 35 °C by whole-sheet weighing and chemical analysis of matched sheets, then continue through the spare month. |
| STORE-2 | Must · Even on the hottest days, no wet chemical appears on the sheet or its edges. | Hang 30 sealed and 30 opened sheets upright at 40 °C and at 35 °C. Inspect the edges weekly and wipe them with an absorbent pad for chemical analysis.; No published figure shows how this laminate leaks at its sealed edges, so the firm must measure it. Hang 30 sealed and 30 opened sheets upright at 40 °C for 30 days. Hang another 30 sealed and 30 opened sheets at 35 °C for 12 months. Look at the edges each week. Wipe each edge with an absorbent pad, and have a lab measure the transfluthrin on it. Correct each result by the wipe method's measured recovery, meaning the share of chemical a wipe really picks up. Pass if no liquid shows and the chemical on the wipes stays under 1% of the sheet's load. | No visible liquid, and total transfluthrin recovered from edge wipes, corrected by the wipe method’s measured recovery, stays under 1% of the load after 30 days at 40 °C and after 12 months at 35 °C. Test 30 sealed and 30 opened sheets at each condition. |
| PACE-1 | Must · On a 35 °C day the sheet gives off at most about one and a half times what it gives on a 25 °C day. | Age framed sheets and bare store pieces side by side at 25, 30 and 35 °C for 12 months. Measure monthly transfluthrin release by weighing plus chemical analysis. | The framed hot-to-cool release ratio targets 1.5 and passes at 1.6 or below. The bare store control must reach at least 2.5. Every interval must also meet the useful-release requirement. The load is sized from the 35 degree result. A ratio above 1.6 opens the heat-slide review. |
| PACE-2 | Must · Even a brand-new sheet on the hottest night, in a shut room, keeps the air safe to breathe for a sleeping child. | A test facility recognised for WHO prequalification work and run under good laboratory practice (strict rules for lab records), such as Ifakara Health Institute in Tanzania, which the inventor's digest names as an established test site, samples air in nanograms per litre (billionths of a gram in each litre of air). Qualified assessors then run an inhalation exposure assessment.; The record gives no release rate, so desk work cannot show the breathing dose. First, the qualified assessors write down each covered group and its documented limit: adults, children, sleepers and pets. Then a recognised test lab working under strict record-keeping rules, such as Ifakara Health Institute in Tanzania, runs both units together in a 30 cubic metre room and a 10 square metre veranda. It measures the air flowing between the two spaces. It samples air in nanograms per litre (billionths of a gram in each litre of air) at sleeping, child, seated and pet breathing heights. It uses fresh sheets at 35 °C to catch the first-day peak, plus aged sheets. Run at least 3 sheets for each grade and condition, then complete the breathing-exposure assessment with its uncertainty. No occupied-home trial starts until every result is below its limit. | Every measured and calculated exposure stays below the documented limit for its covered group, with the assessment method and uncertainty recorded. No occupied-home trial starts before this result passes. |
| PACE-3 | Must · At the end of a hot year, at least 7 of every 10 mosquito landings are stopped, indoors and on the veranda. | Semi-field chambers at a recognised test facility. Wind is logged every 5 minutes at 1 to 4 metres height beside the unit. Air is sampled at 1 to 4 metres from the unit. Run repeated wind directions across the veranda. | Each space shows at least 70% fewer landings than its untreated control at every required check. The lower result governs. The labelled wind limit is the highest sustained tested range that passes repeatedly, not the highest passing gust. |
| PACE-4 | Must · The veranda sheet works harder but still fits the same frame and the same budget. | Measure veranda-grade release at 25 and 35 °C and in a still versus a 0.5 m/s airstream. Try each grade in the wrong frame position to confirm the key works.; The cost sum is already shown: two $0.25 frames over 5 years is $0.10, two $0.18 sheets is $0.36, and packaging is $0.04, so the total is $0.50 (all estimates). Only a test can show whether the veranda grade gives enough chemical from the opening inside a 200 mm by 150 mm frame. Measure the release of at least 5 veranda-grade sheets in their frames at 25 °C and 35 °C, both in still air and in a 0.5 metre-per-second airstream (a gentle breeze). Weigh them at fixed times. Then try each grade in the wrong frame setting 20 times to check that it cannot seat. | The veranda grade reaches the release that passes PACE-3 at the labelled wind limit within the usable refill opening inside the 200 mm x 150 mm frame. |
| PACE-5 | No month dips below the amount that keeps mosquitoes off. | Weigh whole framed sheets at fixed intervals and divide total loss by test days. Each month, analyse sister sheets for chemical left.; Only ageing real sheets shows the monthly release. Hold at least 5 framed sheets of each grade at 25, 30 and 35 °C for 12 months. Weigh each whole frame-and-sheet at fixed times, and divide the weight lost by the days. Each month, cut open 3 sister sheets from the same lot and measure the chemical left. Remove water, carrier liquid, leaks and broken-down chemical from the weight loss before comparing. Pass if every month stays at or above each grade's useful-release value and the two methods agree within 10%. | Monthly transfluthrin release at 25, 30 and 35 °C stays at or above the useful-release value of record every month. Weight loss and chemical analysis agree within 10% after measured loss of other substances, leakage, and chemical breakdown is removed from the comparison. |
| MARK-1 | Must · The window says 'replace' before the protection runs out, and never more than a month late. | Age paired sheets and marks for 12 months at 25, 30 and 35 °C, clean and under set amounts of soot. Read the marks against landing tests at months 9 to 12, and carry runs on through real failure. Dye and film thickness are chosen from these runs.; No calculation can show when a dye fades compared with when protection is lost. The firm must age paired sheets and dye marks for 12 months at 25, 30 and 35 °C, both clean and with set amounts of soot. At least 5 pairs go into each condition for each grade. Run mosquito landing tests every month from month 9 to month 12, and keep going until the sheet really fails. Record each mark reading next to the landing result for the same sheet. Choose the dye and the film thickness from these runs. Pass if every mark shows 'replace' by the last passing check and before the first failing check. | Every mark signals replacement by the last passing monthly check and before the first failing check. At least 90 of 100 readings are correct without words. The window shows a lasting comparison stripe and a crossed-out mosquito symbol after the dye fades. |
| MARK-2 | Nine in ten people tell 'working' from 'replace' at a glance. | Reading test with 100 adults in target districts, using fresh, near-spent and spent sheets, in daylight and lamplight, with and without soot.; How people read a symbol can only be measured with people. Show fresh, nearly spent and spent sheets to 100 adults in target districts, in daylight and lamplight, with and without soot on the grille. Give no words. Count the correct readings. Pass at 90 or more out of 100. | At least 90 of 100 readings are correct without words. The window shows a lasting comparison stripe and a crossed-out mosquito symbol after the dye fades. The window is a 20 mm clear lens at the lower right, below the hood's shadow and outside the grille. |
| MARK-3 | Must · A sheet that is still half covered can never look like it is working. | Fit sheets with the liner pulled 0%, 50%, 90% and 100%, and record what the window shows. | In 100 of 100 tested incomplete-liner fits, the window shows liner colour and no blue dye. The frame shows the active mark only after full liner removal, and the grille keeps fingers away from the treated face. |
| FIX-1 | Each fixing holds the pull of a 5 kg bag hanging on it, and 95 of 100 frames are still in place after a year. | Pull tests on each labelled wall and pole type, then knock, heat, damp and sunlight tests, then a 100-home check at month 12. The pass holds whether a delivery team or the household fixes the frame. Debbie has not recorded a decision on who fixes. | Each fixing holds 50 newtons for 1 minute with less than 2 millimetres movement. At least 95 of 100 frames remain fixed, exposed, and correctly aimed at month 12. |
| FIX-2 | There is a fixing for every common wall and pole, and none of them peels or falls off. | Pull and 12-month field tests per surface type, with any unlisted surface marked 'do not fit'.; No published figure gives the holding strength of these fixings on rough mud and block walls. On each surface type, pull test at least 10 fitted frames with screws in block, long nails with a backing washer in firm mud, and a captive strap on poles. Then watch at least 20 frames for 12 months in real homes. Mark any surface that fails, or was never tested, as 'do not fit'. | Tape, glue pads, loose hooks, and unsupported nails in crumbling mud are excluded. Pole mounting uses a captive ultraviolet-resistant strap or clamp. |
| FIX-3 | Must · Each unit is where its vapour reaches the people and where they can see the window. | Map air levels and landings across the 10 m2 veranda for each placement. Check window visibility from each seat. | Indoor: about 1.1 m above the floor and at least 1 m from the cooking fire. Veranda: about 1.5 m high on the pole facing the incoming evening breeze, with the window facing the seats. |
| SHELL-1 | A child's finger cannot reach the treated sheet. | Probe every slot with the jointed test finger and a small 3 mm probe, and confirm no contact. | The standard jointed test finger cannot touch the sheet. Keep slots 2.5 mm wide and the sheet 5 mm behind them only if the complete frame passes the named probe test. |
| SHELL-2 | Must · Smoke from the cooking fire does not choke the sheet. | Expose framed sheets to measured soot loads in a test room, then measure release and read the marks.; The grille opening of at least 40% can be checked on the drawing. The soot effect has to be measured. First, write down the soot amount, its source, the exposure time, the airflow, the humidity and whether the unit is cleaned. Then put soot on at least 5 framed sheets per grade in a test room. Measure release against clean sheets, and read the marks. Pass if release stays within 20% of a clean sheet and the dirty unit still passes PACE-3, PACE-5, MARK-1 and MARK-2. | Grille open area stays at least 40% of the usable sheet face. After the recorded soot exposure, release stays within 20% of a clean sheet, and the dirty unit still passes PACE-3, PACE-5, MARK-1 and MARK-2. |
| SHELL-3 | A half-peeled sheet will not lock in, so the household notices straight away. | Fit trials with the liner partly and fully removed. | In 100 of 100 trials, a sheet with any liner left does not click into its final locked position. Test intact, partly removed, nearly removed, and torn liners. |
| SHELL-4 | The same frame works for five yearly sheets. | Accelerated weathering of UV-stabilised polypropylene frames, followed by clip and pull tests. | Frame life value of record 5 years (estimate). After accelerated sunlight and heat ageing equal to 5 years, the frame passes FIX-1 and MARK-2, the clips retain the refill, and the grade key still rejects the wrong refill. |
| SWAP-1 | Almost everyone does the yearly swap in under a minute, with clean hands afterwards. | A timed swap trial with 100 adults, run by a qualified team, with hand wipes analysed for transfluthrin.; Only a trial with people shows speed and whether they touch the treated face. A qualified team times 100 adults as each one swaps a sheet. Then the team wipes each person's hands and has a lab test the wipes for transfluthrin. Pass if at least 95 adults finish correctly within 1 minute and every wipe is below the lab method's detection limit. | At least 95 of 100 adults finish correctly within 1 minute. Every hand wipe is below the method's stated detection limit. |
| SWAP-2 | A sheet stored for two years in a hot warehouse works like a new one. | Store pouches at 35 °C. Weigh them and analyse the sheets at 6, 12 and 24 months. | Loss inside the pouch under 1% of the load after 2 years at 35 °C. The sheet then still passes PACE-3. |
| SWAP-3 | Must · People keep sleeping under their nets. | Review label text, run comprehension interviews, and observe net use at each trial visit.; Checking the label text for bed-net and dengue claims is a desk review. Whether people understand it and keep using nets can only be measured. Interview 100 users about the label. At every visit in the trial households, ask about net use and look at the nets. Pass if at least 90 out of 100 understand that bed nets are still needed and at least 90 out of 100 households keep using them. | No label claims that the device replaces bed nets or protects against dengue. At least 90 of 100 users understand that bed nets remain needed. At least 90 of 100 trial households continue reported and observed net use at each check. |
| SWAP-4 | Most old sheets come back to the firm. | Count sheets handed out and returned per district.; The return rate depends on what households do. In each district, count the sheets handed out and the spent sheets returned in each campaign round. Check that the team puts each returned sheet back into a pouch when it is handed in. Report the rate each year against the 80% aim, which is a judgment. | Return rate measured and reported each year, aiming at 80% (a judgment). Spent sheets are re-pouched at hand-in. |
| MAKE-1 | A year of protection for both spaces costs the buyer less than a dollar at the factory gate. | Independent quotes from regional moulders and net makers at stated volumes, reconciled against pilot-lot yield and chemical use. | The complete kit costs under $1 per household-year ex-factory. The working estimate remains $0.50: two $0.25 frames spread across 5 years equal $0.10; two $0.18 refills equal $0.36; packaging equals $0.04. Delivery, installation, collection, and disposal are reported separately. Guardian comparisons remain estimates because its public price is unavailable. |
| MAKE-2 | Every sheet from every maker behaves the same. | Pilot lots at a qualified patch or label converter, then the same open process at regional firms. Measure loading spread, leaks, release spread and rejects.; The spread between sheets comes from the real process. Run pilot lots at a qualified patch or label maker, then run the same open process at regional firms. In each lot, measure the load and the release spread at stated temperatures and ages, using a stated seal-leak method with its detection limit. Test 200 sheets for leaks. Check that sheets at the lowest and highest allowed results still pass the useful-release and breathing limits. Keep stored samples from every lot. | Load within plus or minus 10% of the value of record. Release spread within plus or minus 15% across a pilot lot. Zero seal leaks in 200 sampled sheets. Retained shelf samples kept from every lot. |
| MAKE-3 | Every maker and every test works to the same numbers. | Audit every document and label against the list before release. | The open spec lists: effective air level, release rate per grade, load per grade, hot-to-cool ratio target 1.5 (pass at 1.6 or below), sheet cost $0.18 (estimate), frame life 5 years (estimate), and kit under $1 per household per year ex-factory with $0.50 as a sub-budget estimate. |
| grade-selector fit | Verify every in-tolerance correct-grade refill seats and every wrong-grade refill remains blocked after shared-edge dimensioning, rail movement, sheet-width variation, and five-year-equivalent ageing | == 100 percent correct outcomes | |
| incomplete-liner interlock | Tear reinforced liners deliberately at multiple face, edge, foot, and window locations and verify every incomplete removal remains unlocked and shows liner colour | == 100 percent incomplete removals | |
| Engineering section | Check before parts are ordered: In the failure modes: The child-touching control re-pouches spent sheets only at campaign hand-in. Supply a closing return sleeve with each refill. | == 1 result recorded | |
| Engineering section | Check before parts are ordered: In the cost estimate: The section uses $0.20 per refill while MAKE-3 records $0.18, and its $0.50 annual calculation omits the required $0.04 packaging. Show $0.54 as the current calculation. | == 1 result recorded | |
| grille-slot and insertion-gap access | Probe every candidate opening in the complete frame with the IEC 61032 jointed test finger and the 3 mm probe, then freeze the passing slot dimensions | == 0 treated-face contacts | |
| Engineering section | Check before parts are ordered: The same key ribs have two thicknesses in consecutive making instructions. After replacing the breakaway selector, specify one thickness for each retained stop and locking feature. | == 1 result recorded | |
| grade selector seating | Lock 10 frames at the indoor end and 10 at the veranda end, then attempt 100 wrong-grade and 100 right-grade sheet insertions on each frame and count wrong-grade sheets that reach the seat | == 0 wrong-grade seatings | |
| Engineering section | Check before parts are ordered: The stated minimum wall-entry depth cannot be reached by the listed 40 mm screw after it passes through the frame. Specify wall-entry depth separately from screw length. | == 1 result recorded | |
| Engineering section | Check before parts are ordered: The earlier text priced the sheet itself at $0.20. | == 1 result recorded | |
| Engineering section | Check before parts are ordered: The original 40 mm minimum wall-entry depth has become a 40 mm drilled-hole depth. | == 1 result recorded | |
| Open point | Check before parts are ordered: The selling price is $0.9 in concept, $0.2 in engineering and $0.18 in engineering. | == 1 result recorded | |
| selling price | Settle which value is right: $0.9 in the chosen design or $0.2 in the engineering section. | == 1 value, stated the same everywhere | |
| Parts list | Check before parts are ordered: The parts list adds up to $0.93, but the parts total is given as $0.03 in bom. | == 1 result recorded | |
| Open point | Check before parts are ordered: The change introduces a lower minimum wall-entry depth to make the existing screw fit. | == 1 result recorded | |
| parts cost (BOM total) per unit | Stated two ways in the package: The parts list adds up to $0.93, but the parts total is given as $0.53 in bom and $0.18 in bom and $0.36 in bom and $0.04 in bom and $0.506 in bom and $0.006 in bom and $0.44 in bom and $0.506 in bom. Debbie's panel: Every figure is written as the parts cost for one unit, the same thing on the same basis, and they do not agree. A money figure stated two ways is sett | The prototype shop confirms one value and records it against this id | |
| Material grade: EVA store film blank | Release coupon screen: 50 mm coupons of each EVA grade with each candidate front film, aged at 25°C (degrees Celsius), 30 and 35 °C, weighed and analysed for transfluthrin monthly | No visible liquid at 40 °C; with its front film, framed ratio 1.6 times or below and useful release met at 25°C (degrees Celsius) | |
| Material grade: Transfluthrin, one sheet's load | Purity by gas chromatography against a reference standard | Meets the purity set in the product's WHO prequalification dossier | |
| Material grade: Rate-control film | Same release coupon screen as the store film, with a bare store control | Framed ratio 1.6 times or below; bare control at least 2.5 times; dye colour visible through it | |
| Material grade: Witness dye, reference bar ink and hidden symbol ink | Twelve-month paired ageing at 25°C (degrees Celsius), 30 and 35 °C, clean and sooted, read against landing tests; ink light fastness to ISO 12040 | For both grades through actual failure, the dye signals replacement by the last passing monthly check and before the first failing check; the grey bar and symbol show no visible change | |
| Material grade: Siliconised PET release liner, bought as stock by the roll, then cut and folded on the sheet line | Peel and compatibility screen. Apply each stock liner grade to loaded sheets, age them at 40 °C for 30 days, then measure the peel force and check the liner and sheet for transfluthrin uptake and marking. Fold-foot stiffness is checked in fit trials. | Clean peel in one pull with no tearing, no visible change to the treated face, and a tear-resistant one-piece liner. With liners torn on purpose at several places, all 100 incomplete removals in the SHELL-3 fit trials stay unlocked and show liner colour. If this fails, the foot is dropped. | |
| Material grade: Foil pouch | Store pouched sheets of each candidate stock laminate (plastic outer layer, aluminium foil, heat-seal inner layer) at 35 °C. Weigh the pouches and analyse the sheets for transfluthrin at 6, 12 and 24 months. Run puncture and hot-transport tests as well. | Under 1% of the load lost after 2 years at 35 °C, no seal failures, and the sheet still passes PACE-3 | |
| Fit | Sheet edges in side rails | Go/no-go gauge for rail gap and channel width; optical check of die-cut sheet width | Within 178 mm between rail bottoms, sheet 176 mm wide; rail channel 1.2 mm wide for a 0.6 mm sheet edge Rail gap ±0.3 mm; sheet width ±0.5 mm; channel +0.2/−0 mm, measured from datums A, B, C |
| Fit | Grade selector key and sheet notch | Fixture with dummy indoor and veranda sheets; go/no-go gauge for selector key width (3.0 mm), height (4 mm) and thickness (1.1 mm); correct seating and 100 wrong-grade attempts with the selector locked, repeated after ageing equal to 5 years of sunlight and heat | Within Selector key 3.0 mm wide, 4 mm tall; sheet notch 3.4 mm wide, 5 mm deep; indoor position 49 mm left and veranda position 47 mm right of the rail channel centre plane (datum C) Key and notch width ±0.1 mm; key height and notch depth ±0.2 mm; position ±0.2 mm, measured from datums A, B, C |
| Fit | Liner foot hold-up and final drop | Fixture trials with intact, part-peeled and nearly removed liners, and with liners torn on purpose at several places. All 100 incomplete removals must stay unlocked and show liner colour in the window. | Within Foot holds the sheet 3.0 mm above the seat while it stays joined, through the two reinforced side bands, to all liner film on the face; detent click at full drop only after the whole liner is out ±0.3 mm, measured from datums B, A |
| Fit | Front-to-back snap clips | Go/no-go gauge on the clip hook; pull-apart check after heat ageing | Within 1.0 mm hook engagement, four clips ±0.1 mm, measured from datums A, B, C |
| Fit | Grille set-back from sheet face | Depth gauge through the grille on an assembled frame with a dummy sheet | Within 5.0 mm from inner grille face to sheet face ±0.5 mm, measured from datums A, B |
| Fit | Window lens in front opening | Pin gauge for the opening; optical check of the lens | Within Lens 20.0 mm diameter pressed from inside into a 19.7 mm bore behind the 18.4 mm viewing ledge, 0.15 to 0.30 mm interference Lens +0/−0.05 mm; bore +0.1/−0 mm, measured from datums A, B, C |
| Fit | Dye square under window | Optical check on seated dummy sheets at the extreme allowed positions. The clean and soot-covered 90-of-100 reading tests are then repeated. | Within 8 mm dye square, 1 mm gap and 3 mm grey bar (12 mm by 8 mm together), with the 6 mm crossed-out mosquito symbol inside the dye square. All of it is centred under the 18.4 mm clear hole of the 20 mm window when the sheet sits on its seat. By calculation, the worst corner sits about 8.3 mm from the window centre, inside the 9.2 mm clear radius; to confirm on a prototype. Position ±0.8 mm, measured from datums B, C |
| Fit | Fixing holes | Pin gauge; drilling template check | Within 4.5 mm holes, 120 mm apart Hole +0.2/0 mm; spacing ±0.5 mm, measured from datums A, B |
What this would take
The 5 phases in the plan add up to about $1,510,000 over 30 months. These are planning estimates, not quotes.
Open questions
- FIX-3 The indoor frame sits at seated head height. The veranda frame sits on the breeze side at about standing eye height, with its window facing the seats. This is assumed, not yet tested. How to settle it: Map air levels and landings across the 10 m2 veranda for each placement. Check window visibility from each seat.
- STORE-2 The storage layer holds transfluthrin without visible pooling, running, or leakage at the sealed edges. This is assumed, not yet tested. How to settle it: Hang 30 sealed and 30 opened sheets upright at 40 °C and at 35 °C. Inspect the edges weekly and wipe them with an absorbent pad for chemical analysis.
- SHELL-2 Define soot mass, particle source, exposure time, airflow, humidity, and cleaning state before testing clean and dirty frames. This is assumed, not yet tested. How to settle it: Expose framed sheets to measured soot loads in a test room, then measure release and read the marks.
- PACE-4 Use one identical frame body with a captive installation selector set permanently to indoor or veranda. Blue marks the indoor grade and orange marks the veranda grade. The wrong grade must not seat after the selector is set. This is assumed, not yet tested. How to settle it: Measure veranda-grade release at 25 and 35 °C and in a still versus a 0.5 m/s airstream. Try each grade in the wrong frame position to confirm the key works.
- MARK-1 Pair every mark reading with the landing result for the same grade, age, heat, airflow, and soot condition from startup through actual failure. This is assumed, not yet tested. How to settle it: Age paired sheets and marks for 12 months at 25, 30 and 35 °C, clean and under set amounts of soot. Read the marks against landing tests at months 9 to 12, and carry runs on through real failure. Dye and film thickness are chosen from these runs.
- SWAP-3 Labels and hand-out messages keep families using bed nets and make no dengue claim. This is assumed, not yet tested. How to settle it: Review label text, run comprehension interviews, and observe net use at each trial visit.
- MARK-3 Test intact, partly peeled, nearly removed, and torn liners. The active mark appears only when the complete liner has left the release face. This is assumed, not yet tested. How to settle it: Fit sheets with the liner pulled 0%, 50%, 90% and 100%, and record what the window shows.
- PACE-2 Test the indoor and veranda grades in their intended spaces, both units operating together, measured air movement between spaces, startup peaks, aged sheets, sleeping height, child height, and each covered pet’s breathing height. Name every covered group and its documented limit before testing. This is assumed, not yet tested. How to settle it: A test facility recognised for WHO prequalification work and run under good laboratory practice (strict rules for lab records), such as Ifakara Health Institute in Tanzania, which the inventor's digest names as an established test site, samples air in nanograms per litre (billionths of a gram in each litre of air). Qualified assessors then run an inhalation exposure assessment.
Revision history
| Version | Date | What changed |
|---|---|---|
| 1.0 | November 27, 2026 | First full package. |
Release manifest
Conformance means this package was checked against the Invention Commons Package Standard 1.0.0 for its required parts and stated consistency checks. It does not certify engineering correctness, safety, patentability, ownership or filing readiness.
Open items (1). Each is a check to close before tooling; none stopped the package.
| About | What it means | How it is closed |
|---|---|---|
| parts cost (BOM total) per unit | Stated two ways in the package: The parts list adds up to $0.93, but the parts total is given as $0.53 in bom and $0.18 in bom and $0.36 in bom and $0.04 in bom and $0.506 in bom and $0.006 in bom and $0.44 in bom and $0.506 in bom. Debbie's panel: Every figure is written as the parts cost for one unit, the same thing on the same basis, and they do not agree. A money figure stated two ways is sett | The prototype shop confirms one value and records it against this id |
Prepared November 27, 2026. Figures drawn 2026-11-27 21:46 UTC. Each part below is generated from the same records, so a changed checksum means that part changed.
| Part | Checksum |
|---|---|
| Overview | 39b84b21 |
| How to read this | 0994e008 |
| What it is | 08b825c0 |
| Design starting point | cc1c5cb1 |
| How your attachments were used | 55b57913 |
| Completeness check | 8e6a91fb |
| How it works, step by step | 22b29ecd |
| Drawings | 1a4c0118 |
| The system | 5c784a54 |
| What it must do | 087454c9 |
| Requirements | b01e3c18 |
| Specification | 924bc1b5 |
| Design numbers and their basis | bf29ea59 |
| Worked calculations | 6cd09c81 |
| Product record | 98ffa5ff |
| Parts list and cost to make | c39b4612 |
| Key decisions and trade-offs | da25ce43 |
| Failure modes | add71b70 |
| Approvals to plan for | b1a0ef3a |
| Cost at volume | 175594fe |
| Making and assembling it | 4cac4e59 |
| What could go wrong | 7ad0d5ff |
| Business case | d654236a |
| The invention and how it works | 16b52bcd |
| What's new against the named prior art | bb7d812e |
| Payback | a6c13b43 |
| Plan to get it made | 36c1344c |
| Features believed to be new (no patent search performed) | 439236b4 |
| Verification plan | 8d90db50 |
| What this would take | b63c18d8 |
| Open questions | aa92ddcc |
| Revision history | 044fcd28 |
Provenance
Physical Membrane LLC certifies that, based on the sealed audit log kept for this invention, everything the platform gave the AI models, apart from the user's own idea and input, came from publicly available sources. The complete record of prompts and responses is kept in a sealed, tamper-evident log, available from Physical Membrane LLC under a full NDA in connection with any legal matter.
Root fingerprint: 1351cc560c33d125de065f5581ccfacabbab6a3b20b3bff27b138cd35666e999, date-stamped by OpenTimestamps on November 27, 2026.
The Provenance certificate that comes with this package has the details and how to check them.